Inspections for the day of: Monday, March 6, 2006.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-00379 FIRE-Final Inspection3/6/20063/6/20063/6/2006 4:16:38 PMPFAIL
Val; Phone #: ###-#### Provide city approved plans
BLD04-00639 FIRE-Final Inspection3/6/20063/6/20063/6/2006 4:13:31 PMPFAIL
Val; Phone #: ###-#### Provide city approved plans
BLD05-02489 FIRE-Conference3/3/20063/6/20063/6/2006 3:53:33 PMPDONE
Jack; Phone #: ###-#### I went over manual pull station locations for the hood suppression system with Jack. They need to be located 10' to 20' away and between 4' and 5' AFF.
FIR06-00071 INSP-Final Inspection3/6/20063/6/20063/6/2006 3:25:19 PMPFAIL
sprinkler heads have not been installed and verification is needed of annual inspection
BLD05-03063 FIRE-Final Inspection3/6/20063/6/20063/6/2006 3:24:41 PMPFAIL
Provide the missing sprinkler pendants and provide verification of annual inspection for the fire sprinkler system. Provide annual inspection for the fire extinguisher. Provide approved hardware for all doors (two doors in storage room)
FIR05-00823 INSP-Final Inspection3/6/20063/6/20063/6/2006 1:14:15 PMPPASS
permit finaled
FIR05-00425 INSP-Sprinkler Rough-in/Hydro3/6/20063/6/20063/6/2006 1:13:46 PMPPASS
200lb hydro on the 1st floor wet system passed. 3rd floor dry system trip test passed at 1:30 seconds(less than 500gallons). 1st floor dry system 24 hour air test started at 11:30 with approx. 45psi showing on the guage.
FIR05-00823 INSP-Sprinkler Rough-in/Hydro3/3/20063/6/20063/6/2006 12:15:55 PMAPASS
Inspection was for final not rough-in. Permit finaled.
FIR06-00039 INSP-Final Inspection3/6/20063/6/20063/6/2006 11:30:21 AMPPASS
Permit finaled
BLD05-02956 FIRE-Final Inspection3/3/20063/6/20063/6/2006 11:30:00 AMAPASS
Life safety finaled
FIR06-00039 INSP-Alarm Testing3/2/20063/6/20063/6/2006 11:29:38 AMAPASS
Permit finaled
FIR05-00814 INSP-Final Inspection3/3/20063/6/20063/6/2006 11:15:06 AMAPASS
permit finaled
FIR06-00056 INSP-Sprinkler Rough-in/Hydro3/3/20063/6/20063/6/2006 10:13:44 AMAFAIL
Provide additional upright heads on the west side of the draft stop (approx. 10 heads) and add one upright head at verticle duct blockage in the southwest corner of project.