Inspections for the day of: Tuesday, March 6, 2007.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00587 FIR-Aging Inspection3/6/20073/6/20073/9/2007 12:22:29 PM DONE
Per Rob at Colliers, permit work has not yet started to date.
FIR07-00176 INSP-Final Inspection3/6/20073/6/20073/7/2007 3:14:01 PMPNR
Project is not ready for inspection at this time per contractor.
BLD05-00922 FIRE-Final Inspection3/5/20073/6/20073/7/2007 9:22:14 AMAPASS
Fire life safety finaled.
FIR07-00175 INSP-Final Inspection3/6/20073/6/20073/7/2007 9:16:37 AMPDEFR
Inspection to be scheduled for 3/7.
FIR07-00162 INSP-Sprinkler Rough-in3/5/20073/6/20073/6/2007 3:23:55 PMPPART
The remainder of fire sprinkler mods are approved for cover, final pending ceiling tile and escutcheons.
FIR06-00987 INSP-Final Inspection3/5/20073/6/20073/6/2007 3:22:24 PMPPASS
Fire sprinkler permit finaled.
FIR06-00583 INSP-Sprinkler Rough-in3/5/20073/6/20073/6/2007 3:21:25 PMPPART
OH install at areas as marked and initialed on approved plan set is good for cover.
FIR05-00880 FIR-Aging Inspection3/6/20073/6/20073/6/2007 3:02:47 PMPDONE
Final inspection scheduled.
FIR06-00639 INSP-Sprinkler Rough-in/Hydro3/6/20073/6/20073/6/2007 2:58:39 PMPPART
OH hydrostatic test for the basement level parking garage system and the 1st level garage access ramp fire sprinkler piping completed okay.
FIR07-00169 INSP-Final Inspection3/5/20073/6/20073/6/2007 2:55:19 PMPPASS
Fire sprinkler system modification work passed inspection, contractor to provide signage at the drum drip as discussed.
FIR07-00033 INSP-Sprinkler Rough-in/Hydro3/5/20073/6/20073/6/2007 2:53:26 PMAPART
UG fire supply line hydro passed.
MIS07-00037 FIR-Final3/5/20073/6/20073/6/2007 2:52:25 PMAFAIL
Remove manual thumbturn at the main entry/exit door and provide signage, the fire extinguisher appears to need recharging and must be provided with a current cert. tag.
FIR06-00658 INSP-Final Inspection3/5/20073/6/20073/6/2007 2:48:29 PMAPASS
Items on correction notice have been field verified for compliance, fire sprinkler final inspection passed.