Inspections for the day of: Friday, March 6, 2009.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-02624 BLD-Framing/Rough-in3/5/20093/6/20093/6/2009 4:28:48 PMPPASS
Andrew Phone #: ###-####
ESC08-00950 General Inspection3/6/20093/6/20093/6/2009 4:27:30 PMPPASS
BLD08-02323 BLD-Framing/Rough-in3/6/20093/6/20093/6/2009 4:27:07 PMPPASS
Dustin Phone #: ###-####
MIS09-00026 BLD-Conference3/6/20093/6/20093/6/2009 2:49:26 PMPDONE
This is for a rehab loan. Gary & Ron will be there at 1:30 p.m., if you cannot be there at that time please contact Gary at ###-####. Thank you! Phone #: ###-#### Internet Inspection Request from: Connie LaFrainer
C/N....Siding repair, Hole in Deck/sidewalk, Electr wiring to shed.
ESC09-00080 Site Preparation3/6/20093/6/20093/6/2009 2:46:51 PMPPASS
BLD09-00235 BLD-Framing/Rough-in3/5/20093/6/20093/6/2009 2:46:28 PMPPASS
Bernie-rebar Phone #: ###-####
BLD08-00224 BLD-Framing/Rough-in3/5/20093/6/20093/6/2009 1:11:03 PMPPART
need ok to insulate and cover Phone #: ###-#### Internet Inspection Request from: Jessica Noland
C/N Repair 5/8 rock removed to allow for continuious roof vent at ridge. Call for insp of 5/8 rock membrane on E. 1hr wall. OK to Insulate.
BLD08-01439 BLD-Final3/5/20093/6/20093/6/2009 11:45:35 AMANR
Need Fire Final......
BLD09-00221 BLD-Foundation3/5/20093/6/20093/6/2009 11:39:09 AMACANC
Scheduled by a contractor via Hello! on 3/5/2009 at 8:46:21 AM. Contact: ###-####.
Arrived on site.....appears that footing has not even been poured yet.
BLD08-02567 BLD-Other3/5/20093/6/20093/6/2009 11:19:45 AMAPASS
Scheduled by a contractor via Hello! on 3/5/2009 at 2:01:24 PM. Contact: ###-####.