Inspections for the day of: Friday, March 6, 2009.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE08-02428 ELE-Aging Inspection3/6/20093/6/20093/11/2009 3:55:04 PM DONE
talked to contractor, still under construction
ESC07-00003 General Inspection3/6/20093/6/20093/6/2009 3:23:23 PMPPASS
looked ok
ELE07-02961 Electrical Rough-In3/6/20093/6/20093/6/2009 3:21:16 PMPPASS
John Phone #: ###-####ric ok for kitchen, bedroom, downstairs utilities anop, no esc this project
ESC08-00516 General Inspection3/6/20093/6/20093/6/2009 3:09:31 PMPPASS
looked ok
MIS09-00024 ELE-Conference3/5/20093/6/20093/6/2009 2:41:24 PMPDONE
Tess ###-####, substandard renters complaint see project description for details talked with renter, looked at receptales and fixtures, telephone and catv. There weren't any life safety issues, but quiet a bit of maintenance repair work should be done such as replace receptacles and fixture anchors. Told renter that they need to work out how to get maintenance done with landlord.
ELE08-02994 Final3/6/20093/6/20093/6/2009 12:46:27 PMPFAIL
Phone #: ###-#### Internet Inspection Request from: Tracy Robertson called contractor, left correction notice,NEC 210.8(B)(5) receptacles installed within 6' of sink shall be gfci protected, 422.31(B) shall provide disconnects capable of being locked open for appliances, or in sight of units, 330.30(B) shall strap mc within 12" of box at contactor box, 110.22 shall label and identify panels
ELE09-00237 Conference3/6/20093/6/20093/6/2009 10:14:02 AMADONE
met contractor, talked about sub-panel clearance isuues and that he needs to provide adequate clearance per NEC, no esc this project
ELE09-00318 Electrical Rough-In3/6/20093/6/20093/6/2009 10:08:55 AMAPASS
need to cover ceiling- Phone #: ###-#### Internet Inspection Request from: dennis mcneely ok to cover ceiling, no esc this project
ELE07-02961 Electrical Rough-In3/5/20093/6/20093/6/2009 9:14:05 AMANR
John Phone #: ###-#### met owner, told that he must be done before he calls for inspection, no esc this project
ELE07-02302 Final3/5/20093/6/20093/6/2009 8:35:43 AMAPASS
CONTACT: Mark Knight - partial final amphetheatre Phone #: ###-#### Internet Inspection Request from: Deb Gooden checked u/g with locator, ok, ok to final, signed occupancy card