BLD08-02186
| BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 4:12:44 PM | P | NR |
|
|
Jim Phone #: ###-####
|
BLD08-02187
| BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 4:12:34 PM | P | NR |
|
|
Jim Phone #: ###-####
|
BLD08-02188
| BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 4:12:23 PM | P | NR |
|
|
Jim Phone #: ###-####
|
BLD08-02189
| BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 4:12:13 PM | P | NR |
|
|
Jim Phone #: ###-####
|
ESC08-00871
| Random Inspection | 3/6/2009 | 3/6/2009 | 3/6/2009 4:09:40 PM | P | PASS |
|
|
|
BLD08-02182
| BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 4:09:27 PM | P | PASS |
|
|
Jim Phone #: ###-####. 2nd. floor, 2nd. layer of 5/8 type x rock for, both sides for 2hr. fire wall.
|
BLD08-02183
| BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 4:08:41 PM | P | PASS |
|
|
Jim Phone #: ###-####. 2nd. floor, 2nd. layer of 5/8 type x rock, both sides for 2hr. fire wall.
|
BLD08-02184
| BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 4:07:58 PM | P | PASS |
|
|
Jim Phone #: ###-####. 2nd. floor, 2nd. layer of 5/8 type x rock, both sides for 2hr. fire wall.
|
ESC08-00872
| Random Inspection | 3/6/2009 | 3/6/2009 | 3/6/2009 4:07:14 PM | P | PASS |
|
|
|
ESC08-00873
| Random Inspection | 3/6/2009 | 3/6/2009 | 3/6/2009 4:07:02 PM | P | PASS |
|
|
|
ESC08-00874
| Random Inspection | 3/6/2009 | 3/6/2009 | 3/6/2009 4:06:49 PM | P | PASS |
|
|
|
BLD08-02185
| BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 4:06:36 PM | P | PASS |
|
|
Jim Phone #: ###-####. 2nd floor, 2nd layer of 5/8 type x rock both sides, for 2hr. fire wall ok.
|
BLD08-02190
| BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 4:02:37 PM | P | PASS |
|
|
Jim Phone #: ###-####. 1st. floor, 2nd layer of 5/8 type x rock, remaining side for 2hr. fire wall.
|
BLD08-02192
| BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 4:01:04 PM | P | PASS |
|
|
Jim Phone #: ###-####. 1st. floor, 2nd layer, both sides of 5/8 type x rock for 2hr. fire wall.
|
BLD08-02191
| BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 3:59:44 PM | P | PASS |
|
|
Jim Phone #: ###-####. 1st. floor, 1st. layer of 5/8 type x rock, both sides for 2hr. fire wall.
|
BLD08-02193
| BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 3:58:38 PM | P | PART |
|
|
Jim Phone #: ###-####. 1st. floor, 1st layer of 5/8 type x rock, one side only for 2hr. fire wall.
|
BLD09-00219
| BLD-Final | 3/5/2009 | 3/6/2009 | 3/6/2009 11:04:14 AM | A | PASS |
|
|
Phone #: ###-####
|
BLD09-00219
| DOC - Permit Finaled | 3/6/2009 | 3/6/2009 | 3/6/2009 11:04:06 AM | P | PASS |
|
|
|
BLD08-02384
| BLD-Final | 3/4/2009 | 3/6/2009 | 3/6/2009 9:55:44 AM | A | PASS |
|
|
greg Phone #: ###-####
|
BLD08-02384
| DOC - Permit Finaled | 3/6/2009 | 3/6/2009 | 3/6/2009 9:55:34 AM | P | PASS |
|
|
Letter of compliance issued.
|
BLD09-00163
| BLD-Framing/Rough-in | 3/5/2009 | 3/6/2009 | 3/6/2009 9:34:26 AM | A | PASS |
|
|
richard Phone #: ###-####. Verififed the installtion of backing for ada elements. ok to cover interior steel stud framed walls.
|