Inspections for the day of: Friday, March 6, 2009.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-01486 General Inspection2/17/20093/6/20093/9/2009 11:17:09 AMAPASS
ESC09-00031 Site Preparation ESC3/6/20093/6/20093/6/2009 4:05:42 PM NR
Will re-inspect in 1 week
ESC06-01123 Aging Inspection3/6/20093/6/20093/6/2009 4:01:24 PM DONE
ESC06-01123 DOC - Permit Expired3/6/20093/6/20093/6/2009 4:00:36 PMPPASS
ESC06-01124 Aging Inspection3/6/20093/6/20093/6/2009 3:59:32 PM DONE
ESC06-01124 Site Final3/6/20093/6/20093/6/2009 3:58:07 PMPPASS
ESC08-00491 BMP Violation3/6/20093/6/20093/6/2009 3:57:11 PMPCANC
Moved to 3/09/09 am.
ESC04-01055 BMP Violation3/2/20093/6/20093/6/2009 3:09:46 PMPPASS
issue was corrected.
ESC09-00071 Site Preparation3/6/20093/6/20093/6/2009 3:05:17 PM CANC
ESC06-01125 Aging Inspection3/6/20093/6/20093/6/2009 2:53:16 PM DONE
ESC06-01125 Site Final3/6/20093/6/20093/6/2009 2:52:57 PMPPASS
ESC08-00491 Tracking Control3/5/20093/6/20093/6/2009 9:31:15 AMAFAIL
Verbal to RP (Scott U.)
1. Maintain access point on and off of project area. Extend to 300ft min. Also install a stabilized access into and out of the construction parking area of the job trailers.
2. Maintain all tracking off of project area with scraping and also STREET SWEEPING.
3. Maintain all D.I. along Winco Ct., Freight St., and also Warehouse Rd.
4. Address the turbid water distcharging from outfall on the West end of Warehouse Rd.
5. Add additional fence panels at Winco court to eliminate people from driving on and off of project.
6. Recommended that a "Trackout" sign be posted at the exit of project to notify Sub- Contractors.
Will re-inspect on 3/6/09 4PM today.
ESC06-01126 Aging Inspection3/6/20093/6/20093/6/2009 8:10:47 AM DONE
ESC06-01126 Site Final3/6/20093/6/20093/6/2009 8:10:36 AMAPASS