BLD08-00870
| FIRE-Conference | 3/6/2012 | 3/6/2012 | 3/14/2012 11:38:18 AM | P | DONE |
|
|
I spoke to Mark, with Allied General, today at another job site and he stated that he had spoken to Ken and they were in the process of getting the permit taken care of. I scheduled a folowup inspection for two weeks from now.
|
BLD12-00187
| FIRE-Final Inspection | 3/6/2012 | 3/6/2012 | 3/6/2012 3:53:39 PM | P | FAIL |
|
|
Life safety will be ok when the fire alarm issues have been addressed.
|
BLD11-01395
| FIRE-Final Inspection | 3/5/2012 | 3/6/2012 | 3/6/2012 3:41:38 PM | P | FAIL |
|
|
Provide the annual inspection for the fire extinguishers, provide the wire shelving for the racks or move the racks apart, provide the minumum 4" high address numbers, provide/repair the exit discharge lights and provide the delayed egress hardware for testing.
|
FIR12-00046
| INSP-Final Inspection | 3/5/2012 | 3/6/2012 | 3/6/2012 2:04:29 PM | P | PASS |
|
|
Permit finaled
|
BLD11-02987
| FIRE-Final Inspection | 3/5/2012 | 3/6/2012 | 3/6/2012 11:32:38 AM | P | PASS |
|
|
life safety passed
|
FIR11-00563
| INSP-Sprinkler Rough-in/Hydro | 3/5/2012 | 3/6/2012 | 3/6/2012 11:29:08 AM | A | PASS |
|
|
See the city approved plans for three additional first floor rooms where the sprinkler piping can be covered.
|
BLD11-02958
| FIRE-Final Inspection | 3/5/2012 | 3/6/2012 | 3/6/2012 9:46:42 AM | A | PASS |
|
|
Life safety passed
|