FIR12-00698
| INSP-Alarm Testing | 3/5/2013 | 3/6/2013 | 3/7/2013 12:11:43 PM | P | PART |
|
|
Functional testing and inspection for fire alarm work in "phase one" completed. Noted items include; provide a WP notification appliance in the decontamination room, address at SD's for door release (22 &23) are switched, SD and ID at the south set of hallway doors between phase one and two are not yet installed, ID M8-13 has been relocated to the main corridor beyond phase one, delayed egress provisions at the secured doors must meet conditions per IFC 2009, record drawings and panel maps to match field modifications including device locations and addressing. Chimes/strobes, MP at the nurses station, SD and ID(except as noted) tested okay. *Inspection completed 3/6/13 PM*.
|
FIR12-00691
| INSP-Final Inspection | 3/5/2013 | 3/6/2013 | 3/7/2013 11:48:55 AM | P | PART |
|
|
Fire sprinkler work at "phase one" completed and passed walkthrough inspection.
|
BLD12-02108
| FIRE-Final Inspection | 3/6/2013 | 3/6/2013 | 3/7/2013 11:06:16 AM | P | PASS |
|
|
Fire life safety finaled.
|
FIR12-00679
| INSP-Final Inspection | 3/6/2013 | 3/6/2013 | 3/7/2013 11:05:16 AM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR13-00060
| INSP-Final Inspection | 3/5/2013 | 3/6/2013 | 3/7/2013 11:03:37 AM | P | PASS |
|
|
Fire alarm work passed inspection and testing- flow switch repaired while on site-. Permit finaled.
|
FIR12-00679
| INSP-Supply line flush | 3/6/2013 | 3/6/2013 | 3/7/2013 11:00:34 AM | P | PART |
|
|
UG fire supply line flush completed satisfactory.
|
BLD13-00372
| FIRE-Final Inspection | 3/5/2013 | 3/6/2013 | 3/6/2013 2:50:04 PM | P | FAIL |
|
|
Post "door to remain.." signage at the main entry/exit, post PFE at 48" max. AFF, remove surface bolts and security grate with hasp at both warehouse exits, provide permit documents with the correct address, provide verification of a current annual inspection for the existing fire sprinkler system.
|
BLD12-00863
| FIRE-Final Inspection | 3/6/2013 | 3/6/2013 | 3/6/2013 2:14:09 PM | P | PASS |
|
|
Life safety passed pending manual thumbturn at the exit door is removed- to be corrected prior to structural final inspection for verification at that time per agreement with contractor.
|
BLD13-00124
| FIRE-Final Inspection | 3/6/2013 | 3/6/2013 | 3/6/2013 2:10:07 PM | P | PASS |
|
|
Verified approved plan resubmittal. Fire life safety finaled.
|
FIR12-00723
| INSP-Sprinkler Rough-in | 3/4/2013 | 3/6/2013 | 3/6/2013 1:01:23 PM | A | PART |
|
|
Rough-in at the second floor completed. Discussed shell/TI schedule, hydrostatic test procedures, floor control manifold/PRV isolation valves per the mfg. data sheets and approved plans.
|
FIR12-00328
| INSP-Final Inspection | 3/5/2013 | 3/6/2013 | 3/6/2013 12:57:27 PM | A | PASS |
|
|
Previous inspection items okayed, recieved record of completion documents. Fire alarm permit finaled.
|
FIR12-00327
| INSP-Final Inspection | 3/5/2013 | 3/6/2013 | 3/6/2013 12:53:57 PM | A | PASS |
|
|
C/N items verified. Record of completion forms recieved. Fire alarm permit finaled.
|