Inspections for the day of: Wednesday, March 6, 2013.
Number of inspections: 16
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS13-00042 ELE-Conference3/1/20133/1/2013 A 
ELE11-02589 Final3/6/20133/6/20133/6/2013 1:49:45 PMPPASS
This Is Two Exit Signs In The Warehouse required By Code Enforcement. This Was Done And Not Sure Why We Still Have It Open Call With questions Or Concerns Thanks So Much Dave Phone #: ###-#### >> Inspection requested via web by jason shifflett final ok
ELE13-00497 Final3/6/20133/6/20133/6/2013 1:32:50 PMPPASS
final ok
ELE13-00497 Permanent Service3/5/20133/6/20133/6/2013 1:32:10 PMPPASS
replaced 100amp meter main panel, any questions call Andy @ ###-#### Phone #: ###-#### >> Inspection requested via web by Andy Rose p/s u/g rec ok
ELE13-00498 Electrical Rough-In3/5/20133/6/20133/6/2013 1:06:01 PMPPASS
Contact: Andy Eckhart, underground & rough-in inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden rough-in ok cover west wall of common area, east walls of common area inspected 2/04/13 leaving common area in center. underground for parking lot lighting,gates UL listed heat cable ok for cover
ELE13-00434 Conference3/6/20133/6/20133/6/2013 12:15:20 PMPDONE
Discussed with homowner requirements for service change/relocate
ELE13-00373 Electrical Rough-In3/4/20133/6/20133/6/2013 11:52:08 AMAFAIL
OK to cover ceiling grid >> Inspection requested via web by chris green NEC 300.11(A) Where independent support wires are used, they shall be secured at both ends.
ELE13-00003 Electrical Rough-In3/5/20133/6/20133/6/2013 11:19:38 AMAPASS
Floor heat in master bath Phone #: ###-#### >> Inspection requested via web by Therrin Robertson rough-in ok cover floor heat master bath
ELE13-00434 Final3/5/20133/6/20133/6/2013 11:04:56 AMANH
Steve-after 10:00 please Phone #: ###-#### No access-nobody on job site to allow entery into dwelling
ELE13-00501 Electrical Rough-In3/6/20133/6/20133/6/2013 10:39:46 AMAPASS
work is in back building - washbay area Phone #: ###-#### >> Inspection requested via web by Tim Dunlop power for two overhead door operators in wash bay rough-in ok
ELE13-00190 Final3/4/20133/6/20133/6/2013 10:12:00 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin final ok
ELE13-00491 Permanent Service3/5/20133/6/20133/6/2013 9:44:32 AMAPASS
owner will have door open at 8 Phone #: ###-#### >> Inspection requested via web by Neal Rumsey p/s o/h rec ok
ELE12-02817 Electrical Rough-In3/5/20133/6/20133/6/2013 9:20:50 AMAPASS
Underground inspection - contact is Ben MacDonagh Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover underground service feeder conduits
ELE11-02591 ELE-Aging Inspection3/6/20133/6/20133/6/2013 8:35:57 AM CANC
ELE13-00493 Rough-In Permanent Service3/5/20133/6/20133/6/2013 8:00:42 AMAPASS
Thank you Phone #: ###-#### >> Inspection requested via web by Rowdy Monroe rough-in p/s u/g n ok
ELE13-00493 Rough-In Permanent Service3/5/20133/6/20133/5/2013 12:23:15 PMACANC
rough and service
thank you Phone #: ###-#### >> Inspection requested via web by Rowdy Monroe Inspection cancelled from web by: Rowdy Monroe