Inspections for the day of: Wednesday, March 6, 2013.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00103 BMP Violation3/5/20133/6/20133/7/2013 3:04:44 PMAPASS
Residual
ESC12-00846 Random Inspection3/6/20133/6/20133/6/2013 4:28:56 PMPFAIL
C/N posted. Message to RP;
1. CLean up all hard surfacesof all sediment and debris.
2. Re-install all sediment barrier back behind sidewalk.
Failure to comply with the notice will result in further enforcement. Will re-inspect on 3/7/2013.
ESC12-00885 Random Inspection3/6/20133/6/20133/6/2013 4:28:40 PMPFAIL
C/N posted. Message to RP;
1. CLean up all hard surfacesof all sediment and debris.
2. Re-install all sediment barrier back behind sidewalk.
Failure to comply with the notice will result in further enforcement. Will re-inspect on 3/7/2013.
ESC12-01115 BMP Violation3/5/20133/6/20133/6/2013 4:06:06 PMAFAIL
Still working on the other lots. TOld RP to complete by the end of the work day. Will follow up tomorrow.
ESC12-00774 BMP Violation3/5/20133/6/20133/6/2013 4:03:31 PMAPASS
ESC13-00045 BMP Violation3/5/20133/6/20133/6/2013 4:03:14 PMAFAIL
RP is working on other lots. But has not completed the installation of the gator gaurd. Will re-inspect tomorrow for compliance.
ESC12-01150 BMP Violation3/5/20133/6/20133/6/2013 4:01:39 PMAPART
Still activily working on clean up.
ESC12-01175 BMP Violation3/5/20133/6/20133/6/2013 3:57:03 PMAPASS
ESC12-00938 BMP Violation3/5/20133/6/20133/6/2013 3:47:29 PMAPASS
ESC12-00421 Aging Inspection3/6/20133/6/20133/6/2013 3:31:56 PM PASS
ESC12-00587 Aging Inspection3/6/20133/6/20133/6/2013 3:31:11 PM NH
ESC12-00539 General Inspection3/6/20133/6/20133/6/2013 2:50:08 PM PART
ESC11-00879 Tracking Control3/4/20133/6/20133/6/2013 2:05:31 PMPPASS
ESC12-00828 Complaint Inspection3/6/20133/6/20133/6/2013 11:22:53 AMAFAIL
C/N given to Project manager,. Verbal disclosure to the RP over the C/N;
1. Clean up all hardsurfaces of all sediment and debris.
2. Maintain the washout bin.
3. Clean up all residual of of the soil not in the containment.
3. Protect storm drain out side of the construction area. Maintain the storm drain inlet within the project area.
4. Clean up all trash debris on a daily basis.
5. Clean up all sediment off of the hard surfaces on a daily basis.
6. Provide minimum control measure to prevent and reduce dust. EX: sweeping and water surpression.
Failure to comply wiuth the notice will result in further enforcement. Will reinspect on 3/7/2013PM.
ESC12-01056 General Inspection3/5/20133/6/20133/6/2013 11:03:18 AMAPASS
All measures implimented by the RP for stabilization requirements are approved. No further actions are not needed at this time. If vegitation is not estbalished the RP will need to impliment further stabilization measures. There is no danger to the water conveyance close to the project area due to the rough grading of the disturb area and the vegitative buffer area between the disturbed area and the channel.
ESC13-00144 Site Preparation3/5/20133/6/20133/6/2013 10:57:48 AMAPART
Completed on 3/5/2013

Site looks good per the City requirements. Have installed the sediment barriers along the greenbelt, sign posted with the SWPPP/ESC plan in the mail box located at the access into project area.

Per the compliance assistance with the CGP, I found two deficiences.
1. Must post the NOI at the entrance of the project area. Also found that they began land disturbing activities one day before the 14 day waiting period. Notified City of Boise Public Works (Jim Pardy) and Schmmidt Construction(Dave Robinson) of the two items.