BLD14-00377
| BLD-Conference | 3/5/2014 | 3/6/2014 | 3/6/2014 4:17:48 PM | P | PART |
|
|
Rebar inspection for spread footings along grid lines 9 and 10. Concrete scheduled for 2pm. A 1 pm rebar inspection will be acceptable. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin insp. by si pending report.
|
BLD14-00087
| BLD-Foundation | 3/6/2014 | 3/6/2014 | 3/6/2014 3:53:35 PM | P | PASS |
|
|
Wes Phone #: ###-####
|
BLD13-01960
| BLD-Framing/Rough-in | 3/4/2014 | 3/6/2014 | 3/6/2014 3:53:11 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD14-00032
| BLD-Final | 3/6/2014 | 3/6/2014 | 3/6/2014 2:50:10 PM | P | PASS |
|
|
2nd request, please call 1 hour before so I can ensure access Phone #: ###-#### >> Inspection requested via web by mike duvall
|
BLD14-00032
| DOC - Permit Finaled | 3/6/2014 | 3/6/2014 | 3/6/2014 2:49:32 PM | P | PASS |
|
|
|
BLD13-03137
| BLD-Energy code compliance | 3/6/2014 | 3/6/2014 | 3/6/2014 2:29:46 PM | P | PASS |
|
|
|
BLD13-02244
| BLD-Conference | 3/5/2014 | 3/6/2014 | 3/6/2014 2:07:18 PM | P | PASS |
|
|
rick - about 1 pm please Phone #: ###-####
|
BLD12-03240
| BLD-Energy code compliance | 3/5/2014 | 3/6/2014 | 3/6/2014 11:01:57 AM | A | PASS |
|
|
Please call 10min prior for access - John Phone #: ###-####
|
BLD13-03263
| BLD-Ceiling Grid Inspection | 3/5/2014 | 3/6/2014 | 3/6/2014 10:26:41 AM | A | PASS |
|
|
Gill-Late am please and please call at least 30 mins prior to insepction Phone #: ###-#### pending ele aproval
|
BLD13-03137
| BLD-Wall cover | 3/5/2014 | 3/6/2014 | 3/6/2014 9:32:08 AM | A | DEFR |
|
|
Looking for approval to Sheetrock. Please call with any questions. Thanks Phone #: ###-#### >> Inspection requested via web by Joshua Edwards front porch 2nd storie floor need r-30.
|