BLD12-01135
| BLD-Conference | 2/28/2014 | 2/28/2014 | | P | |
|
|
Bracing may be accomplished by gypsum on interior, nailed with 6D coolers at 7" o.c..
|
BLD14-00248
| BLD-Final | 3/5/2014 | 3/6/2014 | 3/7/2014 11:55:05 AM | P | PART |
|
|
john Phone #: ###-####. ok for temp occ. Needs to resubmit matching floor plan, provide engineering for tube steel testing rack. Also noted that an electrical permit may be required for equipment that is hardwired in. Contacted Jonhn Sears and leftmessage. waiting for call back.
|
BLD13-01075
| BLD-Final | 3/5/2014 | 3/6/2014 | 3/6/2014 2:41:02 PM | P | PEND |
|
|
Joe Phone #: ###-####. Still needs zoning final. Inspection was performed. Needs to add signs to storage racks to read no storage or above 8ft. Everything else ok.
|
BLD13-02049
| BLD-Framing/Rough-in | 3/5/2014 | 3/6/2014 | 3/6/2014 12:47:59 PM | A | PASS |
|
|
Metal stud framing - Mike Phone #: ###-####. Exterior steel stud framing for north west and north east canopies at main enterances.
|
BLD13-02587
| BLD-Energy code compliance | 3/5/2014 | 3/6/2014 | 3/6/2014 9:32:54 AM | A | PASS |
|
|
Exterior insulation - Sanford Phone #: ###-####
|
BLD14-00364
| BLD-Final | 3/5/2014 | 3/6/2014 | 3/6/2014 9:32:26 AM | A | PASS |
|
|
shawn Phone #: ###-####
|
BLD14-00364
| DOC - Permit Finaled | 3/6/2014 | 3/6/2014 | 3/6/2014 9:32:12 AM | P | PASS |
|
|
|