Inspections for the day of: Thursday, March 6, 2014.
Number of inspections: 7
Percentage of inspections complete: 86 %
Percentage of inspections not complete: 14 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-01135 BLD-Conference2/28/20142/28/2014 P 
Bracing may be accomplished by gypsum on interior, nailed with 6D coolers at 7" o.c..
BLD14-00248 BLD-Final3/5/20143/6/20143/7/2014 11:55:05 AMPPART
john Phone #: ###-####. ok for temp occ. Needs to resubmit matching floor plan, provide engineering for tube steel testing rack. Also noted that an electrical permit may be required for equipment that is hardwired in. Contacted Jonhn Sears and leftmessage. waiting for call back.
BLD13-01075 BLD-Final3/5/20143/6/20143/6/2014 2:41:02 PMPPEND
Joe Phone #: ###-####. Still needs zoning final. Inspection was performed. Needs to add signs to storage racks to read no storage or above 8ft. Everything else ok.
BLD13-02049 BLD-Framing/Rough-in3/5/20143/6/20143/6/2014 12:47:59 PMAPASS
Metal stud framing - Mike Phone #: ###-####. Exterior steel stud framing for north west and north east canopies at main enterances.
BLD13-02587 BLD-Energy code compliance3/5/20143/6/20143/6/2014 9:32:54 AMAPASS
Exterior insulation - Sanford Phone #: ###-####
BLD14-00364 BLD-Final3/5/20143/6/20143/6/2014 9:32:26 AMAPASS
shawn Phone #: ###-####
BLD14-00364 DOC - Permit Finaled3/6/20143/6/20143/6/2014 9:32:12 AMPPASS