FIR15-00117
| INSP-Final Inspection | 3/6/2015 | 3/6/2015 | 3/6/2015 3:10:56 PM | P | PASS |
|
|
permit finaled
|
BLD14-03470
| FIRE-Conference | 3/6/2015 | 3/6/2015 | 3/6/2015 2:52:35 PM | P | DONE |
|
|
Goldy had questions regarding the fire rated assembly/door. I deferred him to the building inspector
|
BLD14-01580
| FIRE-Final Inspection | 3/5/2015 | 3/6/2015 | 3/6/2015 2:50:17 PM | A | PASS |
|
|
life safety passed
|
FIR15-00111
| INSP-Final Inspection | 3/5/2015 | 3/6/2015 | 3/6/2015 2:49:41 PM | A | PASS |
|
|
permit finaled
|
FIR14-00689
| INSP-Final Inspection | 3/5/2015 | 3/6/2015 | 3/6/2015 2:49:15 PM | A | FAIL |
|
|
General alarm signals to be set up as latching, need map a facp mounted
|
FIR14-00572
| INSP-Final Inspection | 3/5/2015 | 3/6/2015 | 3/6/2015 2:48:01 PM | A | PASS |
|
|
permit finaled
|
BLD14-03588
| FIRE-Final Inspection | 3/5/2015 | 3/6/2015 | 3/6/2015 1:06:49 PM | A | PASS |
|
|
life safety passed
|
FIR15-00117
| INSP-Alarm Testing | 3/5/2015 | 3/6/2015 | 3/6/2015 11:17:02 AM | A | PASS |
|
|
Permit finaled
|