Inspections for the day of: Friday, March 6, 2015.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00230 General Inspection3/6/20153/6/20153/10/2015 8:26:43 AM CANC
ESC12-00403 General Inspection3/6/20153/6/20153/9/2015 8:04:40 AM CANC
ESC14-00684 General Inspection3/6/20153/6/20153/6/2015 3:41:45 PM PASS
ESC14-01150 Site Preparation3/6/20153/6/20153/6/2015 3:37:12 PMPPASS
Stinker Station addition/remodel is in progress. BMPs installed, no trackout or discharges. Project manager & store contact notified me about the start of construction.

Approved.
ESC14-00759 General Inspection3/6/20153/6/20153/6/2015 3:00:40 PM PASS
WIP. Hillside silt fence perimeter is in good condition. No trackout or discharges. No new development on the erosion on the adjacent site.


ESC14-00848 Aging Inspection3/6/20153/6/20153/6/2015 2:57:47 PM PASS
No activity. Pool partially complete. Will resume this spring. No issues at site related to the pool construction.

ESC15-00024 Site Preparation3/6/20153/6/20153/6/2015 2:45:59 PMPFAIL
Excavation started without site prepartion inspection or BMP installation per ESC site plan. No permit posted. Hillside residential project.

Left voicemail on RP that permit and BMPs need to be installed Monday or SWO will be issued until completed.
ESC14-00212 General Inspection3/6/20153/6/20153/6/2015 2:23:21 PMPPART
Lusk Street has minimal trackout and MS4 DI has sediment protection. Disturbed area where culvert was installed behind Anniversary Inn has been hydoseeded/tacified.

Corrections:
-pick up construction litter on and around site (bits of cardboard, insulation, and ciggie butts)
- install wattle at toe of slope leading to culvert outlet in DD3 creek. Disturbed slope could cause sediment runoff and there is no BMP.
ESC12-00130 General Inspection3/6/20153/6/20153/6/2015 1:53:19 PM PASS
WIP at River's Edge. Royal Blvd currently closed for construction work. MS4 drop inlets have sediment filter bags. No discharges or uncontained material spills at site. Silt fence along Greenbelt is in good condition.
ESC13-00930 General Inspection3/6/20153/6/20153/6/2015 11:52:40 AM PASS
ESC14-00965 Random Inspection3/6/20153/6/20153/6/2015 11:29:50 AMAPASS
Airport sign and landscaping project is complete.
Requested that Diamond Contractors remove the sediment bag when they pick up the rest of their equipment and request a site final.

No loose sediment, uncontained materials, or other issues.
ESC14-00878 Aging Inspection3/6/20153/6/20153/6/2015 11:02:25 AM PASS
Some activity on runways occuring on south side of airport area. No trackout, dust, or offsite stockpiles in use. Site is self contained and in restricted area. No corrections.
ESC15-00041 Site Preparation3/5/20153/6/20153/6/2015 10:40:05 AMAPASS
Dan Phone #: ###-####

BMPs installed. Site ready for construction. Peppermill subdivision currently in compliance.
ESC15-00088 Site Preparation3/5/20153/6/20153/6/2015 10:37:13 AMAPASS
Dan Phone #: ###-####

Permit posted. Lined concrete washout has been provided for Peppermill as requested previously. Stormwater drainage system has sediment protection.

Approved.
ESC15-00087 BMP Violation3/6/20153/6/20153/6/2015 10:26:19 AMPFAIL
Corrections needed. 2nd notice given to CBH contacts.

1. Install drop inlet protection on the MS4 on Dunham at site.
2. Provide trash container to prevent wind blown trash.
3. Pick up trash that is laying around

Will check back
ESC14-00505 General Inspection3/6/20153/6/20153/6/2015 9:47:31 AM PASS
WIP on lanscaping and some utility & irrigation line work. Keeping dirt off hard surfaces. No corrections.
ESC14-00835 General Inspection3/6/20153/6/20153/6/2015 9:44:39 AM PASS
Carport is built. Talked to supervisor Pat and he informed me that parking lot will get final sweeping, cleaning and striping early next week.

No trackout or sediment runoff. Inlets have filter bag protection.