ELE13-02975
| ELE-Aging Inspection | 3/6/2018 | 3/6/2018 | 3/8/2018 8:47:13 AM | | DONE |
|
|
Still waiting
|
ELE18-00847
| Temporary Service | 3/6/2018 | 3/6/2018 | 3/6/2018 4:08:56 PM | P | PASS |
|
|
Dan 208=-###-#### Inspection requested via web by Dan Hobdey t/s o/h n ok
|
ELE18-00843
| Electrical Rough-In | 3/6/2018 | 3/6/2018 | 3/6/2018 3:22:02 PM | P | PASS |
|
|
undergound conduit Phone #: ###-#### Inspection requested via web by Lee VanSchoiack u/g to well head and vault ok to cover
|
ELE18-00308
| Final | 3/6/2018 | 3/6/2018 | 3/6/2018 3:21:24 PM | P | PART |
|
|
We are requesting a final inspection for this afternoon. Our contact is Bryant @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Temp occ card signed. ok to occupy
|
ELE18-00848
| Electrical Rough-In | 3/6/2018 | 3/6/2018 | 3/6/2018 2:48:05 PM | P | PASS |
|
|
Key is on top of the electrical meter if nobody is on site. Call John if there are any problems. Phone #: ###-#### Inspection requested via web by John Harvey Whole house ok to cover
|
ELE18-00808
| Final | 3/2/2018 | 3/6/2018 | 3/6/2018 1:44:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jonathan Poot Final for furnace install ok
|
ELE18-00811
| Electrical Rough-In | 3/6/2018 | 3/6/2018 | 3/6/2018 1:15:01 PM | P | PASS |
|
|
Please call prior to arrival for access. Phone #: ###-#### Inspection requested via web by Patrick Paz Master floor heat ok to cover
|
ELE18-00754
| Permanent Service | 3/6/2018 | 3/6/2018 | 3/6/2018 12:29:16 PM | P | PASS |
|
|
p/s u/g rec ok
|
ELE18-00664
| Final | 3/5/2018 | 3/6/2018 | 3/6/2018 11:44:31 AM | A | CANC |
|
|
P: ###-#### hoemowner Phone #: ###-#### Inspection requested via web by Ashley Rasmussen No body answered door
|
ELE18-00795
| Electrical Rough-In | 3/5/2018 | 3/6/2018 | 3/6/2018 11:43:53 AM | A | CANC |
|
|
Please call Gary ###-#### to meet you and let you in. If you have any other questions please feel free to contact Tony ###-####. Thanks!!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Contact called and no answer
|
ELE17-04231
| Final | 3/6/2018 | 3/6/2018 | 3/6/2018 11:04:40 AM | A | PASS |
|
|
garage code 7591 Phone #: ###-#### Inspection requested via web by kevin blackmon Final ok
|
ELE16-02746
| Electrical Rough-In | 3/6/2018 | 3/6/2018 | 3/6/2018 10:49:32 AM | A | PASS |
|
|
Second floor Lobby and Main ground floor Lobby fur down ready for rough inspection Phone #: ###-#### Inspection requested via web by Kenneth Chapman Main floor and 2nd floor elevator lobby hard lids only ok to cover
|
ELE18-00823
| Rough-In Permanent Service | 3/5/2018 | 3/6/2018 | 3/6/2018 10:32:23 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Rough-in ok to cover p/s u/g n ok
|
ELE18-00820
| Electrical Rough-In | 3/5/2018 | 3/6/2018 | 3/6/2018 10:10:48 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dave Brueggemann Up bedroom only ok to cover
|
ELE18-00754
| Permanent Service | 2/28/2018 | 3/6/2018 | 3/6/2018 9:49:13 AM | A | CANC |
|
|
Any questions please call Jordan at ###-#### or Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller No one on site and not ready wil reschedule
|
ELE18-00802
| Conference | 3/2/2018 | 3/6/2018 | 3/6/2018 9:23:52 AM | A | DONE |
|
|
Call Kurtis if you have any questions. Phone #: ###-#### Inspection requested via web by Christy Cheney Discussed service change options, Contractor will mount 3 meter main pack and refeed to both down apartments and 2 panel for main floor and up apartment willl be in a room in back and all exposed wiring will be replace or be prevented form physical damage.
|
ELE13-02991
| ELE-Aging Inspection | 3/6/2018 | 3/6/2018 | 3/6/2018 9:12:11 AM | | CANC |
|
|
Too busy
|
ELE13-03005
| ELE-Aging Inspection | 3/6/2018 | 3/6/2018 | 3/6/2018 9:11:52 AM | | CANC |
|
|
Too busy
|
ELE18-00308
| Final | 3/5/2018 | 3/6/2018 | 3/6/2018 8:59:11 AM | A | FAIL |
|
|
We are requesting a final inspection for tomorrow morning. Our contact is Bryant @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate 110.25 lockable disc for 120V plug in washer(outlets not readily accesible in first row of washers) 408 Panel schedules needed Re-check all outlets
|