MEC19-00808
| Rough-in | 3/6/2019 | 3/6/2019 | 3/6/2019 3:33:21 PM | P | PASS |
|
|
Call manny 20 min advance Thanks Phone #: ###-#### Inspection requested via web by Manuel Canto - R/I ok - 20lb gas pressure test ok
|
MEC19-00925
| Pressure Test | 3/5/2019 | 3/6/2019 | 3/6/2019 2:35:48 PM | P | PASS |
|
|
Please call Chuck on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - 20lb gas pressure test ok to unit heater
|
MEC19-00925
| Final | 3/5/2019 | 3/6/2019 | 3/6/2019 2:35:24 PM | P | CANC |
|
|
Please call Chuck on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - unit heater will be finished when homeowner has roof done on shop. Roofing company wants to install the roof jack. - schedule inspection when unit heater is finished
|
MEC19-00212
| Final | 3/4/2019 | 3/6/2019 | 3/6/2019 1:42:52 PM | P | PASS |
|
|
Call Jason @ ###-#### with any issues. Phone #: ###-#### Inspection requested via web by Angie Maguire - final ok
|
MEC18-02559
| Mec-Aging Inspection | 3/6/2019 | 3/6/2019 | 3/6/2019 1:15:42 PM | | DONE |
|
|
Called TML and talked with Debbie about their mechanical aging permit. Schedule inspection with homeowner if work is finished.
|
MEC18-02529
| Mec-Aging Inspection | 3/6/2019 | 3/6/2019 | 3/6/2019 1:10:25 PM | | DONE |
|
|
Called CANFIELD HVAC and talked with Steve about their mechanical aging permit that needed corrections made on a failed final. Schedule inspection with home owner if corrections have been made.
|
MEC19-00794
| Rough-in | 3/5/2019 | 3/6/2019 | 3/6/2019 1:05:01 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - floor boot needs sealed - b vent in the attic needs 1 " clearances at roof - 5lb flue pressure test fail
|
MEC19-00794
| Pressure Test | 3/5/2019 | 3/6/2019 | 3/6/2019 1:03:34 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - 5lb flue pressure test fail gauge was at zero - 20lb gas pressure test ok - tagged meter location
|
MEC19-00933
| Rough-in | 3/5/2019 | 3/6/2019 | 3/6/2019 1:02:19 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Shoecraft - fireplace R/I ok
|
MEC19-00640
| Rough-in | 3/5/2019 | 3/6/2019 | 3/6/2019 9:45:27 AM | A | PART |
|
|
Bill Burch site contact. Phone #: ###-#### Inspection requested via web by RM Mechanical - duct seal inspection ok on unit in gym insulation cover ok this unit - fresh airs for unit in gym and north side need to terminated side wall not through asphalt roof
|
MEC19-00934
| Final | 3/5/2019 | 3/6/2019 | 3/6/2019 8:54:03 AM | A | PASS |
|
|
SErgio Phone #: ###-#### - 2 exhaust fans and supply relocate ok
|