Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-02534 Conference3/4/20203/6/20203/6/2020 2:38:50 PMPPASS
Need to discuss wire preparation before sheet rock. Phone #: ###-#### Inspection requested via web by Daniel Grover...discussed make up requirements-length of conductors out of box and pig tail to device, wiring of bathroom with one circuit, and smoke detectors wired off the bedroom circuit requirement
ELE19-04770 Final3/6/20203/6/20203/6/2020 2:20:57 PMPPASS
call for code Phone #: ###-#### Inspection requested via web by Robert Murray...ok to final
ELE20-00790 Permanent Service3/6/20203/6/20203/6/2020 1:56:26 PMPPASS
p/s o/h reconnect ok
ELE20-00790 Final3/6/20203/6/20203/6/2020 1:16:29 PMPPASS
This was a emergency the customer has no power.
upgrading service from a 100 to 200 amp panel. Please call Dakota @ ###-#### wit any questions. Please do in the afternoon to allow for completion. Phone #: ###-#### Inspection requested via web by William Salts...
p/s o/h reconnect ok
ELE18-04606 Final3/6/20203/6/20203/6/2020 12:43:49 PMPPASS
Inspection requested via web by Steven Ragan..
corrections made for perm service...location is vacant as of 3/6/20...ok to final out permit
ELE18-04605 Final3/6/20203/6/20203/6/2020 12:40:57 PMPPASS
Inspection requested via web by Steven Ragan...no corrections required at time of perm service...power on now...ok to final
ELE19-04826 Final3/6/20203/6/20203/6/2020 12:24:25 PMPPASS
Please contact Raul with any questions. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins...
surface wiring...conduit and m/c...interior lighting and exterior lighting on buildings
ELE20-00793 Final3/6/20203/6/20203/6/2020 12:00:14 PMPPASS
Service off for over 1 year. feeds panel in back of Idaho Survey Group. Panel feeds Unit heater. Label for Outside breaker on order. Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer...verified breaker blank installed...service for heater only no other branch circuits...ok to final
ELE20-00793 Permanent Service3/6/20203/6/20203/6/2020 11:59:13 AMPPASS
Service off for over 1 year. feeds panel in back of Idaho Survey Group. Panel feeds Unit heater. Label for Outside breaker on order. Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer...
p/s u/g reconnect ok
ELE19-03758 Conference3/6/20203/6/20203/6/2020 11:41:51 AMPDONE
Bldg K conference for ACs on roof.
Contact Ben ###-#### Phone #: ###-#### Inspection requested via web by Todd Hall...discussed wiring of A/Cs on rooftop...disconnect/switch location-not OCPD-access requirement and wiring to ea individual A/C accross floor of roof not using A/C as support locations
ELE19-03639 Electrical Rough-In3/5/20203/6/20203/6/2020 11:38:46 AMAFAIL
Rough in for breezeway furred down ceilings at entrances.
Rough in for Heat Tape home run and switch legs.
Contact Ben ###-#### Phone #: ###-#### Inspection requested via web by Todd Hall...
1) wiring required to be installed in box...heat tape wiring needs completed
ELE20-00788 Electrical Rough-In3/5/20203/6/20203/6/2020 10:44:34 AMAPASS
call for access and to meet at site Phone #: ###-#### Inspection requested via web by steve sellers...new back patio area-cans, ceiling fans, w/p receptacles, and switching...2nd rough inspection required once new slider door installed and switching installed to new location
ELE20-00681 Rough-In Permanent Service3/5/20203/6/20203/6/2020 10:27:19 AMAPASS
Phone #: ###-#### Inspection requested via web by Rodney Monroe...
rough ok to cover
p/s u/g new ok
ELE20-00680 Rough-In Permanent Service3/5/20203/6/20203/6/2020 10:26:47 AMAPASS
Phone #: ###-#### Inspection requested via web by Rodney Monroe...
rough ok to cover
p/s u/g new ok
ELE20-00785 Temporary Service3/5/20203/6/20203/6/2020 10:24:30 AMAPASS
Phone #: ###-#### Inspection requested via web by Neal Rumsey...t/s u/g new ok
ELE20-00173 Final3/5/20203/6/20203/6/2020 9:19:04 AMAPASS
Phone #: ###-#### Inspection requested via web by Davin Moore...ok to final...new offices...existing lighting and circuits...no card on site to sign
ELE20-00725 Electrical Rough-In3/6/20203/6/20203/6/2020 9:00:09 AMAPASS
Contact: Jeremy Thornock, underground inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden...
underslab feeds...ok to cover