ELE19-02534
| Conference | 3/4/2020 | 3/6/2020 | 3/6/2020 2:38:50 PM | P | PASS |
|
|
Need to discuss wire preparation before sheet rock. Phone #: ###-#### Inspection requested via web by Daniel Grover...discussed make up requirements-length of conductors out of box and pig tail to device, wiring of bathroom with one circuit, and smoke detectors wired off the bedroom circuit requirement
|
ELE19-04770
| Final | 3/6/2020 | 3/6/2020 | 3/6/2020 2:20:57 PM | P | PASS |
|
|
call for code Phone #: ###-#### Inspection requested via web by Robert Murray...ok to final
|
ELE20-00790
| Permanent Service | 3/6/2020 | 3/6/2020 | 3/6/2020 1:56:26 PM | P | PASS |
|
|
p/s o/h reconnect ok
|
ELE20-00790
| Final | 3/6/2020 | 3/6/2020 | 3/6/2020 1:16:29 PM | P | PASS |
|
|
This was a emergency the customer has no power. upgrading service from a 100 to 200 amp panel. Please call Dakota @ ###-#### wit any questions. Please do in the afternoon to allow for completion. Phone #: ###-#### Inspection requested via web by William Salts... p/s o/h reconnect ok
|
ELE18-04606
| Final | 3/6/2020 | 3/6/2020 | 3/6/2020 12:43:49 PM | P | PASS |
|
|
Inspection requested via web by Steven Ragan.. corrections made for perm service...location is vacant as of 3/6/20...ok to final out permit
|
ELE18-04605
| Final | 3/6/2020 | 3/6/2020 | 3/6/2020 12:40:57 PM | P | PASS |
|
|
Inspection requested via web by Steven Ragan...no corrections required at time of perm service...power on now...ok to final
|
ELE19-04826
| Final | 3/6/2020 | 3/6/2020 | 3/6/2020 12:24:25 PM | P | PASS |
|
|
Please contact Raul with any questions. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins... surface wiring...conduit and m/c...interior lighting and exterior lighting on buildings
|
ELE20-00793
| Final | 3/6/2020 | 3/6/2020 | 3/6/2020 12:00:14 PM | P | PASS |
|
|
Service off for over 1 year. feeds panel in back of Idaho Survey Group. Panel feeds Unit heater. Label for Outside breaker on order. Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer...verified breaker blank installed...service for heater only no other branch circuits...ok to final
|
ELE20-00793
| Permanent Service | 3/6/2020 | 3/6/2020 | 3/6/2020 11:59:13 AM | P | PASS |
|
|
Service off for over 1 year. feeds panel in back of Idaho Survey Group. Panel feeds Unit heater. Label for Outside breaker on order. Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer... p/s u/g reconnect ok
|
ELE19-03758
| Conference | 3/6/2020 | 3/6/2020 | 3/6/2020 11:41:51 AM | P | DONE |
|
|
Bldg K conference for ACs on roof. Contact Ben ###-#### Phone #: ###-#### Inspection requested via web by Todd Hall...discussed wiring of A/Cs on rooftop...disconnect/switch location-not OCPD-access requirement and wiring to ea individual A/C accross floor of roof not using A/C as support locations
|
ELE19-03639
| Electrical Rough-In | 3/5/2020 | 3/6/2020 | 3/6/2020 11:38:46 AM | A | FAIL |
|
|
Rough in for breezeway furred down ceilings at entrances. Rough in for Heat Tape home run and switch legs. Contact Ben ###-#### Phone #: ###-#### Inspection requested via web by Todd Hall... 1) wiring required to be installed in box...heat tape wiring needs completed
|
ELE20-00788
| Electrical Rough-In | 3/5/2020 | 3/6/2020 | 3/6/2020 10:44:34 AM | A | PASS |
|
|
call for access and to meet at site Phone #: ###-#### Inspection requested via web by steve sellers...new back patio area-cans, ceiling fans, w/p receptacles, and switching...2nd rough inspection required once new slider door installed and switching installed to new location
|
ELE20-00681
| Rough-In Permanent Service | 3/5/2020 | 3/6/2020 | 3/6/2020 10:27:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe... rough ok to cover p/s u/g new ok
|
ELE20-00680
| Rough-In Permanent Service | 3/5/2020 | 3/6/2020 | 3/6/2020 10:26:47 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe... rough ok to cover p/s u/g new ok
|
ELE20-00785
| Temporary Service | 3/5/2020 | 3/6/2020 | 3/6/2020 10:24:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey...t/s u/g new ok
|
ELE20-00173
| Final | 3/5/2020 | 3/6/2020 | 3/6/2020 9:19:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Davin Moore...ok to final...new offices...existing lighting and circuits...no card on site to sign
|
ELE20-00725
| Electrical Rough-In | 3/6/2020 | 3/6/2020 | 3/6/2020 9:00:09 AM | A | PASS |
|
|
Contact: Jeremy Thornock, underground inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden... underslab feeds...ok to cover
|