PLM96-00396
| INSP - Sprinkler & Backflow | 3/7/1996 | 3/7/1996 | 3/7/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - SP. FINAL O/K 3/7/96
|
PLM95-00715
| INSP - Final | 3/6/1996 | 3/7/1996 | 3/7/1996 12:00:00 AM | A | PASS |
|
|
03/06/96 347 - W/C 2 BASIN 4 TUB 1 SHR 1 SINK 1 W/B 1 W/H 1 WILL CAULK TUB & SHR FACEPLATES/TRIM CUT OFF T&P DISSCHARGE LINE TO 6" ABOVE GARAGE FLOOR
|
PLM96-00141
| INSP - Final | 3/6/1996 | 3/7/1996 | 3/7/1996 12:00:00 AM | A | PASS |
|
|
03/06/96 347 - THIS WILL BE READY AFTER 9:00 THURSDAY W/C 2 BASIN 2 TUB 1 SHR 1 SINK 1 W/B 1 W/H 1 FINAL O/K 3/7/96 347
|
PLM96-00414
| INSP - Sprinkler & Backflow | 3/6/1996 | 3/7/1996 | 3/7/1996 12:00:00 AM | P | PASS |
|
|
03/06/96 347 - THIS IS FOR AM THURSDAY CONVERSION TO PVB 3/7/96 347
|
PLM96-00428
| INSP - Plumbing Rough-in | 3/7/1996 | 3/7/1996 | 3/7/1996 12:00:00 AM | P | PASS |
|
|
03/07/96 347 - 2 W/C 3 LAV 1 TUB 1 SHOWER 1 SINK 1 W/B 1 W/HEATER 3:00 T CORRECT COUNT R/I O/K 3/7/96 347
|
PLM96-00432
| INSP - Water lines | 3/7/1996 | 3/7/1996 | 3/7/1996 12:00:00 AM | P | PASS |
|
|
03/07/96 347 - WATER LINE O/K DRESSER TEE----?
|
PLM96-00433
| INSP - Water softener | 3/7/1996 | 3/7/1996 | 3/7/1996 12:00:00 AM | P | NR |
|
|
03/07/96 347 - INSTALL WATER SOFTENER $1,545.60
|