Inspections for the day of: Tuesday, March 7, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00235 BLD-Framing/Rough-in3/6/20003/7/20003/7/2000 12:00:00 AMAPART
###-#### Suggested meeting with mechanical inspector for hood exhaust. 3/7/00 1:43:26 PM
BLD98-02865 BLD-Wall cover3/6/20003/7/20003/7/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/06/2000 at 12:36:54. Contact: ###-####. Need approved plans. 3/7/00 1:42:46 PM
BLD98-02866 BLD-Wall cover3/6/20003/7/20003/7/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/06/2000 at 12:38:28. Contact: ###-####. Need approved plans. 3/7/00 1:42:55 PM
BLD00-00497 BLD-Footing3/6/20003/7/20003/7/2000 12:00:00 AMAPASS
###-####
BLD00-00155 BLD-Foundation3/6/20003/7/20003/7/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/06/2000 at 19:36:15. Contact: ###-####. Set backs ok'd by P&Z. 3/7/00 1:43:06 PM
BLD99-02755 BLD-Final3/7/20003/7/20003/7/2000 12:00:00 AMPFAIL
call first Ted ###-#### Exterior out-lets, need caulk. 3/8/00 10:36:29 AM
MEC99-03616 Final3/7/20003/7/20003/7/2000 12:00:00 AMPPASS
ted ###-#### Call first
BLD99-00403 BLD-Final3/7/20003/7/20003/7/2000 12:00:00 AMPFAIL
Ted ###-#### call first Crawl insulation. 3/8/00 10:36:16 AM
BLD99-03555 BLD-Concrete3/7/20003/7/20003/7/2000 12:00:00 AMPPART
early pm Rod ###-#### Walls. 3/8/00 10:36:55 AM
BLD99-03310 BLD-Framing/Rough-in3/7/20003/7/20003/7/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/07/2000 at 08:52:33. Contact: ###-####. Right front areas ok to sheetrock. 3/8/00 10:36:51 AM
BLD99-03738 BLD-Foundation3/7/20003/7/20003/7/2000 12:00:00 AMPPASS
###-#### Walls. 3/8/00 10:36:00 AM
BLD99-01927 BLD-Final3/7/20003/7/20003/7/2000 12:00:00 AMPPASS
###-####