Inspections for the day of: Tuesday, March 7, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00138 BLD-Final3/3/20003/7/20003/7/2000 12:00:00 AMAPASS
tony =-###-#### fn
BLD99-03351 BLD-Framing/Rough-in3/6/20003/7/20003/7/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/06/2000 at 13:27:00. Contact: ###-####. See C/N. 3/7/00 11:38:03 AM
BLD99-03187 BLD-Final3/6/20003/7/20003/7/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/06/2000 at 13:37:16. Contact: ###-####. L/C issued. 3/7/00 11:38:16 AM
BLD00-00346 BLD-Footing3/6/20003/7/20003/7/2000 12:00:00 AMAPART
###-#### Incomplete ok. 3/7/00 11:38:29 AM
BLD99-03631 BLD-Framing/Rough-in3/6/20003/7/20003/7/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/06/2000 at 14:41:32. Contact: ###-####. Ok to side. 3/7/00 11:37:56 AM
BLD00-00188 BLD-Framing/Rough-in3/6/20003/7/20003/7/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/06/2000 at 19:24:20. Contact: ###-####.
BLD99-03107 BLD-Final3/7/20003/7/20003/7/2000 12:00:00 AMPPASS
1-###-#### L/C issued. 3/8/00 10:39:04 AM
BLD98-03724 BLD-Framing/Rough-in3/7/20003/7/20003/7/2000 12:00:00 AMPPASS
###-#### call first to meet there
BLD99-02959 BLD-Final3/7/20003/7/20003/7/2000 12:00:00 AMPFAIL
Greg ###-#### No CDH inspection. 3/8/00 10:38:43 AM
BLD99-02985 BLD-Final3/7/20003/7/20003/7/2000 12:00:00 AMPFAIL
garage door open Steve ###-#### C/N grading. 3/9/00 2:08:19 PM
BLD99-02739 BLD-Final3/7/20003/7/20003/7/2000 12:00:00 AMPFAIL
mark ###-#### Ok after Elec. final. 3/8/00 10:38:23 AM
BLD98-02894 BLD-Framing/Rough-in3/7/20003/7/20003/7/2000 12:00:00 AMPPART
###-#### Ok to c over WIP on wing 500. 3/8/00 10:37:45 AM