BLD01-00467
| BLD-Foundation | 3/6/2001 | 3/7/2001 | 3/7/2001 12:00:00 AM | A | PART |
|
|
###-####
|
BLD01-00466
| BLD-Foundation | 3/6/2001 | 3/7/2001 | 3/7/2001 12:00:00 AM | A | PART |
|
|
###-####
|
MEC00-04434
| Final | 3/6/2001 | 3/7/2001 | 3/7/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 16:23:44. Contact: ###-####.c/n posted to support and insulate supply line near crawl space access. 3/7/2001 11:00:28 AM
|
BLD01-00109
| BLD-Framing/Rough-in | 3/6/2001 | 3/7/2001 | 3/7/2001 12:00:00 AM | A | PART |
|
|
Don ###-####ok to cover went over areas of ext walls which need to be repaired to maintain fire resistive const, with contractor. 3/7/2001 11:16:57 AM
|
BLD00-02817
| BLD-Foundation | 3/6/2001 | 3/7/2001 | 3/7/2001 12:00:00 AM | P | PASS |
|
|
late pm ###-####walls ok. 3/7/2001 5:01:13 PM
|
BLD00-03645
| BLD-Other | 3/6/2001 | 3/7/2001 | 3/7/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 09:57:06. Contact: ###-####.
|
BLD00-03403
| BLD-Framing/Rough-in | 3/7/2001 | 3/7/2001 | 3/7/2001 12:00:00 AM | P | FAIL |
|
|
fr insp amon-- ###-#### c/n posted 3/7/2001 1:24:16 PM
|
BLD01-00069
| BLD-Final | 3/7/2001 | 3/7/2001 | 3/7/2001 12:00:00 AM | P | NR |
|
|
###-####
|
BLD01-00246
| BLD-Footing | 3/7/2001 | 3/7/2001 | 3/7/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 407 On 3/7/2001 3:23:21 PM mono pour wall and footing, wall reinforcement not in place at this time. note 2 horizontal bars in footing.
|