Inspections for the day of: Wednesday, March 7, 2001.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03626 BLD-Footing3/5/20013/7/20013/7/2001 12:00:00 AMAPART
###-#### wip-appears ok 3/7/2001 10:50:57 AM
BLD00-02804 BLD-Final3/6/20013/7/20013/7/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/06/2001 at 12:33:48. Contact: ###-####. c/n issued-deck needs completed, fire caulk needed at garage ceiling at vacuum line penetration. 3/7/2001 12:50:36 PM
BLD01-00386 BLD-Footing3/6/20013/7/20013/7/2001 12:00:00 AMAPASS
Dave ###-####
BLD00-03439 BLD-Energy code compliance3/6/20013/7/20013/7/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/06/2001 at 13:29:39. Contact: .
BLD01-00196 BLD-Framing/Rough-in3/6/20013/7/20013/7/2001 12:00:00 AMAPART
###-####Ok to insulate--c/n issued--solid bearing needed on M-1, E-6, C-3, rotation blocks at front entry, air seal on comm. lines. 3/7/2001 12:32:56 PM
BLD00-03579 BLD-Final3/6/20013/7/20013/7/2001 12:00:00 AMPPASS
###-####LC #20122 issued, outside grading not completed at time of inspection due to winter time conditions. 3/7/2001 3:43:12 PM
BLD01-00439 BLD-Foundation3/7/20013/7/20013/7/2001 12:00:00 AMPPART
###-#### hd not installed at time of inspection. 3/7/2001 1:27:21 PM
BLD00-03560 BLD-Energy code compliance3/7/20013/7/20013/7/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/07/2001 at 09:03:09. Contact: .
BLD01-00526 BLD-Footing3/7/20013/7/20013/7/2001 12:00:00 AMPPASS
###-####
BLD01-00002 BLD-Energy code compliance3/7/20013/7/20013/7/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/07/2001 at 11:17:20. Contact: ###-####.