ELE02-00569
| Permanent Service | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | PASS |
|
|
andy -###-#### per ser
p/s o/h rec ok 3/7/2002 11:05:33 AM
|
ELE02-00582
| Electrical Rough-In | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | FAIL |
|
|
###-#### PATRICK corrections not made called will meet contractor at 1:00 pm for conference 3/7/2002 11:38:32 AM
|
ELE02-00164
| Final | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | PASS |
|
|
###-#### LYNN ok 3/7/2002 4:27:36 PM
|
ELE02-00625
| Rough-In Permanent Service | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | NR |
|
|
1###-#### called 3/7/2002 1:45:47 PM
|
ELE01-04026
| Final | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | PASS |
|
|
fn pat ###-#### ok 3/7/2002 10:29:14 AM
|
ELE02-00148
| Final | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 11:25:12. Contact: ###-####. Idaho Electric ok but cannot final job because hvac contractor's electrical contractor did not secure permit and has coorection posted for electrical work done at 3 roof top units see Jack Frank for details this is a mess 3/7/2002 6:58:44 PM
|
ELE02-00579
| Permanent Service | 3/4/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | PASS |
|
|
PER SER KEVIN ###-####
p/s o/h rec. ok 3/7/2002 3:49:41 PM
|
ELE02-00582
| Electrical Rough-In | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | PART |
|
|
r/i -re-insp -david ###-#### conference ok needs to remove outside outlets and hall outlet from kit circuit, and provide 6 inches free lenth conductors at all boxes as code states 3/7/2002 3:51:34 PM
|