Inspections for the day of: Thursday, March 7, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE02-00569 Permanent Service3/6/20023/7/20023/7/2002 12:00:00 AMAPASS
andy -###-#### per ser

p/s o/h rec ok 3/7/2002 11:05:33 AM
ELE02-00582 Electrical Rough-In3/6/20023/7/20023/7/2002 12:00:00 AMAFAIL
###-#### PATRICK corrections not made called will meet contractor at 1:00 pm for conference 3/7/2002 11:38:32 AM
ELE02-00164 Final3/6/20023/7/20023/7/2002 12:00:00 AMAPASS
###-#### LYNN ok 3/7/2002 4:27:36 PM
ELE02-00625 Rough-In Permanent Service3/7/20023/7/20023/7/2002 12:00:00 AMANR
1###-#### called 3/7/2002 1:45:47 PM
ELE01-04026 Final3/6/20023/7/20023/7/2002 12:00:00 AMAPASS
fn pat ###-#### ok 3/7/2002 10:29:14 AM
ELE02-00148 Final3/6/20023/7/20023/7/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 03/06/2002 at 11:25:12. Contact: ###-####. Idaho Electric ok but cannot final job because hvac contractor's electrical contractor did not secure permit and has coorection posted for electrical work done at 3 roof top units see Jack Frank for details this is a mess 3/7/2002 6:58:44 PM
ELE02-00579 Permanent Service3/4/20023/7/20023/7/2002 12:00:00 AMPPASS
PER SER KEVIN ###-####


p/s o/h rec. ok 3/7/2002 3:49:41 PM
ELE02-00582 Electrical Rough-In3/7/20023/7/20023/7/2002 12:00:00 AMPPART
r/i -re-insp -david ###-#### conference ok needs to remove outside outlets and hall outlet from kit circuit, and provide 6 inches free lenth conductors at all boxes as code states 3/7/2002 3:51:34 PM