ELE02-00430
| Final | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | NR |
|
|
brian-- cell ###-#### fn had conf 3/7/2002 11:58:21 AM
|
ELE02-00075
| Electrical Rough-In | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 14:07:06. Contact: ###-####.
U/G Ok 3/7/2002 12:38:58 PM
|
ELE01-03158
| Electrical Rough-In | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | PASS |
|
|
phil ###-####--pool bond
|
ELE01-03489
| Final | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | FAIL |
|
|
fn robert ###-#### corrections not made $42
reinspection fee due 3/7/2002 11:55:28 AM
|