BLD00-03729
| BLD-Framing/Rough-in | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | NR |
|
|
###-#### BRUCE; need elec r/i at sanctuary 3/7/2002 10:51:13 AM
|
BLD01-00234
| BLD-Final | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | PART |
|
|
fn wendell ###-####--pending fire insp; ok for t/o; keep c/n. 3/7/2002 1:58:50 PM
|
BLD02-00172
| BLD-Conference | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 3/7/2002 10:59:54 AM w/ Slrmc supt. at site
|
BLD00-01649
| BLD-Conference | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 3/7/2002 10:29:26 AM w/ supt. re final: need door astragals/smoke seals as per prior c/n.
|
BLD00-03361
| BLD-Final | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 10:21:31. Contact: ###-####. c/n w/ BLD 01-00234...ok for t/o only. see c/n 3/7/2002 1:58:08 PM
|
MIS02-00014
| BLD-Conference | 2/4/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 340 On 2/4/2002 4:31:57 PM left c/n as add'l notice to obtain c/o (application?) by 3-11-02 3/7/2002 3:52:44 PM
|
BLD00-03538
| BLD-Conference | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 3/7/2002 3:08:30 PM w/ John Resseigh,CHSQA: 1" max. space for sealants (FD150,3M) at 2hr windows at shaft ok per Technical Glass Products.
|
BLD00-02242
| BLD-Conference | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/7/2002 3:12:15 PM w/ Jason B & new contractor at site...left c/n list to complete items.
|
MEC02-00577
| Conference | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/7/2002 4:51:05 PM w/ homeowner, need r/i insp approved, no call by contractor
|
MEC02-00159
| Conference | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 3/7/2002 4:52:15 PM w/ owner, need ducts connected to fittings for exhaust...range hood?
|
BLD01-00512
| BLD-Final | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 07:53:26. Contact: ###-####. struct ok for perm...awaiting plbg perm final, need to install therapy tubs. 3/7/2002 1:57:07 PM
|
BLD02-00035
| BLD-Framing/Rough-in | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | FAIL |
|
|
###-#### fr--bill...need other ok's,fireblox, temp. glass,etc. see cn 3/7/2002 4:41:38 PM
|