Inspections for the day of: Thursday, March 7, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00076 Final3/6/20023/7/20023/7/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 03/06/2002 at 14:19:35. Contact: ###-####. went through wrong building 3/7/2002 5:13:07 PM
MEC02-00077 Final3/6/20023/7/20023/7/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 03/06/2002 at 14:20:52. Contact: ###-####. went through wrong building 3/7/2002 5:13:23 PM
MEC02-00075 Final3/6/20023/7/20023/7/2002 12:00:00 AMACANC
MEC99-02620 Final3/6/20023/7/20023/7/2002 12:00:00 AMAFAIL
this was a model home and did not sell so now we need a final\\###-#### doors locked..need info from general cont 3/7/2002 12:39:52 PM
MEC01-02862 Pressure Test3/7/20023/7/20023/7/2002 12:00:00 AMPPASS
pres test ###-#### henry all 2# gas line from meter to equipment has been tested at 60#...will test low pressure when equip set 3/7/2002 4:05:25 PM
MEC02-00225 Final3/7/20023/7/20023/7/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/07/2002 at 08:22:54. Contact: ###-####.
MEC02-00493 Final3/7/20023/7/20023/7/2002 12:00:00 AMPPASS
MEC02-00656 Final3/5/20023/7/20023/7/2002 12:00:00 AMPNR
###-#### no f/p installed yet 3/7/2002 3:27:00 PM