MEC02-00076
| Final | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 14:19:35. Contact: ###-####. went through wrong building 3/7/2002 5:13:07 PM
|
MEC02-00077
| Final | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 14:20:52. Contact: ###-####. went through wrong building 3/7/2002 5:13:23 PM
|
MEC02-00075
| Final | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | CANC |
|
|
|
MEC99-02620
| Final | 3/6/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | A | FAIL |
|
|
this was a model home and did not sell so now we need a final\\###-#### doors locked..need info from general cont 3/7/2002 12:39:52 PM
|
MEC01-02862
| Pressure Test | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | PASS |
|
|
pres test ###-#### henry all 2# gas line from meter to equipment has been tested at 60#...will test low pressure when equip set 3/7/2002 4:05:25 PM
|
MEC02-00225
| Final | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 08:22:54. Contact: ###-####.
|
MEC02-00493
| Final | 3/7/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | PASS |
|
|
|
MEC02-00656
| Final | 3/5/2002 | 3/7/2002 | 3/7/2002 12:00:00 AM | P | NR |
|
|
###-#### no f/p installed yet 3/7/2002 3:27:00 PM
|