PLM03-00558
| Sprinkler (Final) | 3/6/2003 | 3/7/2003 | 3/7/2003 12:00:00 AM | A | PASS |
|
|
###-#### sp final ok 3/7/2003 8:29:43 AM
|
PLM03-00542
| Sprinkler (Final) | 3/6/2003 | 3/7/2003 | 3/7/2003 12:00:00 AM | A | PASS |
|
|
###-#### sprinkler final ok 3/7/2003 8:42:52 AM
|
PLM03-00420
| Plumbing Rough-in | 3/7/2003 | 3/7/2003 | 3/7/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 3/7/2003 at 7:56:11 AM. Contact: ###-####. up top ri ok 3/7/2003 12:47:24 PM
|
PLM03-00254
| Final | 3/7/2003 | 3/7/2003 | 3/7/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/7/2003 at 8:43:24 AM. Contact: ###-####. laundry final ok 3/7/2003 12:16:54 PM
|
PLM03-00538
| Water and/or Sewer | 3/7/2003 | 3/7/2003 | 3/7/2003 12:00:00 AM | P | PART |
|
|
sewer service 3/10/2003 10:37:42 AM
|
PLM03-00464
| Plumbing Rough-in | 3/6/2003 | 3/7/2003 | 3/7/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 3/6/2003 at 1:59:47 PM. install required service sink, ok to cover everything except the wall where the required service sink is to be installed. 3/7/2003 1:26:51 PM
|