FIR03-00089
| INSP-Sprinkler Rough-in/Hydro | 3/6/2003 | 3/7/2003 | 3/7/2003 8:59:27 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 3/6/2003 at 2:17:24 PM. Contact: ###-####. Inspection cancelled from web by: Trent Bice
|
MIS03-00015
| MEC-Final | 3/7/2003 | 3/7/2003 | 3/7/2003 12:00:00 AM | A | FAIL |
|
|
need occupant load sign per plans; "Door to remian unlocked..." sign at main exit; replace ceiling tiles where new sprinkler pipe drops to cooler
|
BLD01-01347
| FIRE-Conference | 3/5/2003 | 3/7/2003 | 3/7/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 3/5/2003 at 10:32:30 AM. met with Jason; reviewed plans and wlaked the project area; will need 60 minute doors on all storage/linen rooms as shown on plans; penetrations will need protection; will need to test alarms and review sprinkler plans 3/7/2003 10:31:57 AM
|
FIR03-00043
| INSP-Final Inspection | 3/6/2003 | 3/7/2003 | 3/7/2003 12:00:00 AM | A | PASS |
|
|
###-#### gill
|