ELE05-00678
| Final | 3/4/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | A | PASS |
|
|
We 1)installed 2 new 120 volt circuits for counter receptacles 2)extended the existing emergency light circuit to a new emergency light 3) extended the existing roof-top receptacle circuit to a new GFCI receptacle near this tenant space's air conditioner 4)installed a new receptacle for the telephone system.Please meet us on-site at 8:30 AM for the tour.This is between the Moxie Java and the HobbyTown USA stores.Thanks!!!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok to final 3/7/2005 9:53:30 AM
|
ELE05-00717
| Rough-In Permanent Service | 3/4/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | A | CANC |
|
|
cameron ###-#### told cameron to have homeowner meet me on job for a conference 3/7/2005 9:59:30 AM
|
ELE05-00698
| Rough-In Permanent Service | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | A | PASS |
|
|
HAVE A GOOD MONDAY; Phone #: ###-#### Internet Inspection Request from: Bob Glenn ric ok . p/s u/g n ok 3/7/2005 8:08:03 AM
|
ELE05-00071
| Rough-In Permanent Service | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 3/7/2005 at 8:05:02 AM. Contact: ###-####. called contr. told him he needs access point for conc encased electrode . ric ok p/s u/g n ok 3/7/2005 2:03:59 PM
|
ELE05-00720
| Electrical Rough-In | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | P | PASS |
|
|
please call at least a half hour prior to inspection so he can meet ya there////###-#### dave called contr about nail plates, ric ok 3/7/2005 2:55:08 PM
|
ELE05-00680
| Electrical Rough-In | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Heather Packer ok to cover 2 walls and doors 3/7/2005 12:15:19 PM
|
ELE05-00353
| Rough-In Permanent Service | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/7/2005 at 9:39:44 AM. Contact: ###-####. called contr and left message to use nm cable conn at back lite box, rest of corrections made. ric ok p/s u/g n ok 3/7/2005 12:52:53 PM
|
ELE05-00430
| Final | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | P | PASS |
|
|
###-#### john 3/7/2005 12:26:52 PM called contr to bond hot and cold water pipe, signed occ. card, ok to final 3/7/2005 12:28:11 PM
|
ELE04-03108
| Conference | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | P | DONE |
|
|
cliff; Phone #: ###-#### Internet Inspection Request from: Barbara Moore reviewed some ideas for owners needs to wire his shop 3/7/2005 5:05:30 PM
|
ELE05-00187
| Final | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | P | FAIL |
|
|
jennifer; Phone #: ###-#### Internet Inspection Request from: Barbara Moore met with owner, recpts had open grounds in 3 places, gfcis not wired correctly and in wrong place in ckt. Will call again. 3/7/2005 3:51:28 PM
|