FIR04-00460
| FIR-Aging Inspection | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | | NR |
|
|
|
FIR05-00062
| INSP-Sprinkler Rough-in/Hydro | 3/4/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | A | PASS |
|
|
Fire sprinklers ok to cover above hard lids 3/7/2005 9:06:40 AM
|
FIR05-00115
| INSP-Conference | 3/4/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | A | CANC |
|
|
wrong permit for alarm inspection 3/7/2005 11:14:12 AM
|
BLD05-00427
| FIRE-Sprinkler Rough-in | 3/4/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | A | PASS |
|
|
Fire life safety finaled 3/7/2005 9:05:59 AM
|
BLD04-02973
| FIRE-Conference | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | A | DONE |
|
|
Sprinkler piping above the vaulted ceiling in the elevator lobby is ok to cover but will not be finaled until the revized piping size is approved. If piping is not approved all changes will be required to meet approval prior to finaling permit.
|
FIR05-00107
| INSP-Sprinkler Rough-in/Hydro | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | P | PART |
|
|
Sprinkler piping above the vaulted ceiling in the elevator lobby is ok to cover but will not be finaled until the revized piping size is approved. If piping is not approved all changes will be required to meet approval prior to finaling permit.
|
FIR04-00742
| INSP-Final Inspection | 3/3/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | P | PASS |
|
|
Hood suppresson system operated correctly 3/7/2005 4:08:01 PM
|
BLD05-00427
| FIRE-Final Inspection | 3/4/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled 3/7/2005 1:51:37 PM
|
BLD04-02809
| FIRE-Conference | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | P | DONE |
|
|
Contractor wanted to go over notes and show me the status/location of the project 3/7/2005 1:56:31 PM
|
FIR04-00809
| INSP-Final Inspection | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | P | PASS |
|
|
Fire sprinklers finaled 3/7/2005 3:54:59 PM
|
FIR04-00760
| INSP-Final Inspection | 3/7/2005 | 3/7/2005 | 3/7/2005 12:00:00 AM | P | PASS |
|
|
Fire sprinklers finaled 3/7/2005 4:14:08 PM
|