ESC05-01778
| Tracking Control | 3/6/2006 | 3/7/2006 | 3/7/2006 4:44:15 PM | A | PASS |
|
|
FOLLOW UP. Access controls in place and construction entrance rock in at entrance. Sweep daily or as needed.
|
ESC05-01130
| Tracking Control | 3/7/2006 | 3/7/2006 | 3/7/2006 12:00:00 AM | P | FAIL |
|
|
Correction to rp. Excessive track out on hard surfaces.
|
ESC05-01884
| Complaint Inspection | 3/7/2006 | 3/7/2006 | 3/7/2006 12:00:00 AM | P | FAIL |
|
|
STOP WORK ISSUED plus written correction notice. Excessive mud track out, hundreds of yards and then sediment laden water observed flowing into drop inlet close to irrigation canel.
|
ESC05-01884
| Tracking Control | 3/7/2006 | 3/7/2006 | 3/7/2006 12:00:00 AM | P | PART |
|
|
Lifted stop work but continued compliance to 8-17 is required. Mud trackout from project is not acceptable. Sweeping as needed is required. Protection of drop inlets is required.
|
ESC04-00912
| Tracking Control | 3/7/2006 | 3/7/2006 | 3/7/2006 12:00:00 AM | P | FAIL |
|
|
Access fencing has been removed; Informed Chris that he needs to re-install access controls or expand acceptable construction entrance by the end of the day of 3-8-06 or a stop work will be issued.
|