ESC05-01228
| BMP Violation | 3/6/2006 | 3/7/2006 | 3/9/2006 8:55:37 AM | A | CANC |
|
|
|
ESC05-01330
| Tracking Control | 2/14/2006 | 3/7/2006 | 3/7/2006 9:58:55 AM | A | PASS |
|
|
Site looks okay.
|
ESC05-00964
| Tracking Control | 2/14/2006 | 3/7/2006 | 3/7/2006 9:58:42 AM | A | PASS |
|
|
Site looks okay.
|
ESC05-00933
| Tracking Control | 2/14/2006 | 3/7/2006 | 3/7/2006 9:55:30 AM | A | PART |
|
|
talked to RP about a bit of trash on site.
|
ESC05-00965
| Tracking Control | 3/7/2006 | 3/7/2006 | 3/7/2006 9:52:47 AM | P | FAIL |
|
|
verbal c/n to RP. ESC sign needs to be reposted, and d/i protection needs maintained. must be completed by the end of the day or a stop work may be issued.
|
ESC05-00417
| Tracking Control | 3/7/2006 | 3/7/2006 | 3/7/2006 9:47:34 AM | P | PASS |
|
|
Site looks good.
|
ESC05-00417
| Tracking Control | 3/7/2006 | 3/7/2006 | 3/7/2006 9:46:16 AM | P | CANC |
|
|
|
ESC05-01870
| Tracking Control | 2/15/2006 | 3/7/2006 | 3/7/2006 9:45:25 AM | A | PASS |
|
|
Site looks good.
|
ESC04-00126
| Tracking Control | 2/14/2006 | 3/7/2006 | 3/7/2006 9:44:51 AM | A | PASS |
|
|
Site looks good.
|
ESC05-01750
| Tracking Control | 3/7/2006 | 3/7/2006 | 3/7/2006 9:39:08 AM | P | PASS |
|
|
Construction has just started. Sediment barriers are in place. contacted RP about getting ESC sign posted today.
|