ESC06-01615
| BMP Violation | 3/5/2007 | 3/7/2007 | 3/7/2007 1:37:21 PM | A | PASS |
|
|
Issues on c/n have been addressed and site has been graded to prepare for landscaping and final stabilization.
|
ESC06-01612
| BMP Violation | 3/5/2007 | 3/7/2007 | 3/7/2007 1:36:13 PM | A | PASS |
|
|
Issues on c/n have been addressed.
|
ESC06-01614
| BMP Violation | 3/5/2007 | 3/7/2007 | 3/7/2007 1:35:53 PM | A | PASS |
|
|
Issues on c/n have been addressed.
|
ESC06-01582
| BMP Violation | 3/5/2007 | 3/7/2007 | 3/7/2007 1:34:22 PM | A | PASS |
|
|
Issues on c/n have been addressed and site has been graded to prepare for landscaping and final stabilization.
|
ESC06-01581
| Site Preparation | 3/5/2007 | 3/7/2007 | 3/7/2007 1:32:51 PM | A | PASS |
|
|
Issues on c/n have been addressed and site has been graded to prepare for landscaping and final stabilization.
|
ESC06-01576
| BMP Violation | 3/5/2007 | 3/7/2007 | 3/7/2007 1:30:26 PM | A | PASS |
|
|
Issues on c/n have been addressed and site has been graded to prepare for landscaping and final stabilization.
|
ESC06-01851
| BMP Violation | 3/7/2007 | 3/7/2007 | 3/7/2007 11:51:52 AM | P | FAIL |
|
|
Responded to citizen complaint. C/N issued to address trash maintenance needed on site, sediment in gutter and sidewalks needs addressed. I will reinspect site on 3-9-07.
|
ESC06-01850
| BMP Violation | 3/7/2007 | 3/7/2007 | 3/7/2007 11:51:30 AM | P | FAIL |
|
|
Responded to citizen complaint. C/N issued to address trash maintenance needed on site, sediment in gutter and sidewalks needs addressed. I will reinspect site on 3-9-07.
|
ESC06-01853
| BMP Violation | 3/7/2007 | 3/7/2007 | 3/7/2007 11:50:12 AM | P | FAIL |
|
|
Responded to citizen complaint. C/N issued to address trash maintenance needed on site, sediment in gutter and sidewalks needs addressed. I will reinspect site on 3-9-07.
|
ESC06-01848
| BMP Violation | 3/7/2007 | 3/7/2007 | 3/7/2007 11:48:31 AM | P | FAIL |
|
|
Responded to citizen complaint. C/N issued to address trash maintenance needed on site, sediment in gutter and sidewalks needs addressed. I will reinspect site on 3-9-07.
|
ESC05-01218
| BMP Violation | 3/7/2007 | 3/7/2007 | 3/7/2007 11:39:19 AM | P | FAIL |
|
|
Responded to citizen complaint. C/N issued to address trash maintenance needed on site, sediment in gutter and sidewalks needs addressed and d/i directly in front of site needs to be protected. Left vm for RP. I will reinspect site on 3-9-07.
|
ESC05-01209
| BMP Violation | 3/7/2007 | 3/7/2007 | 3/7/2007 11:39:09 AM | P | FAIL |
|
|
Responded to citizen complaint. C/N issued to address trash maintenance needed on site, sediment in gutter and sidewalks needs addressed and d/i directly in front of site needs to be protected. Left vm for RP. I will reinspect site on 3-9-07.
|
ESC06-00143
| Site Final | 3/7/2007 | 3/7/2007 | 3/7/2007 10:12:56 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC06-00088
| Tracking Control | 3/7/2007 | 3/7/2007 | 3/7/2007 10:12:10 AM | P | PART |
|
|
verbal c/n to RP to address street sweeping needed on villa norte.
|
ESC06-00870
| Tracking Control | 3/7/2007 | 3/7/2007 | 3/7/2007 10:11:29 AM | P | PART |
|
|
verbal c/n to RP to address street sweeping needed on villa norte.
|
ESC06-01654
| Site Final | 3/7/2007 | 3/7/2007 | 3/7/2007 10:04:47 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-00929
| Site Final | 3/7/2007 | 3/7/2007 | 3/7/2007 10:04:26 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC03-01534
| Site Final | 3/7/2007 | 3/7/2007 | 3/7/2007 10:03:50 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC03-01048
| Site Final | 3/7/2007 | 3/7/2007 | 3/7/2007 10:03:06 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-00546
| Site Final | 3/7/2007 | 3/7/2007 | 3/7/2007 10:02:29 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC03-01647
| Site Final | 3/7/2007 | 3/7/2007 | 3/7/2007 10:01:51 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC03-01133
| Site Final | 3/7/2007 | 3/7/2007 | 3/7/2007 10:01:13 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC03-01572
| Site Final | 3/7/2007 | 3/7/2007 | 3/7/2007 9:59:29 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-01856
| Site Final | 3/7/2007 | 3/7/2007 | 3/7/2007 9:28:42 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-01584
| Site Final | 3/7/2007 | 3/7/2007 | 3/7/2007 9:22:38 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC06-01348
| Complaint Inspection | 3/7/2007 | 3/7/2007 | 3/7/2007 9:12:03 AM | P | FAIL |
|
|
Responded to citizen complaint regarding erosion on slopes from site. Steve Webb and myself inspected site. C/N issued to address no ESC sign, sweeping needed on hard surface to prevent trackout onto Parkhill, sediment barriers needed at base of slope along Parkhill and on uphill side of the driveway. Also the drain leading to the culvert and the retention pond needs to be cleaned out and protected. Issues must be completed by the end of the day or a stop work will be issued. I will reinspect site on 3-8-07. Left message for RP, c/n is posted on site. Notified citizen who complained of action taken.
|