Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-00212 BLD-Final3/7/20073/7/20073/7/2007 5:18:15 PMPNR
BLD06-02534 BLD-Final3/7/20073/7/20073/7/2007 5:17:58 PMPNR
BLD06-01238 BLD-Footing3/7/20073/7/20073/7/2007 3:21:29 PMPPASS
per perry ok to re-open permit --david ###-#### cell call 1st before insp
BLD06-02047 BLD-Foundation3/7/20073/7/20073/7/2007 3:21:07 PMPNR
Matt; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
BLD06-02048 BLD-Foundation3/7/20073/7/20073/7/2007 3:20:46 PMPFAIL
Matt; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Missing #5 verts from column pad footings for front canopy. #3 ties installed improperly. Will needs rfi from engineer for epoxy and special insp.
BLD07-00070 BLD-Foundation3/7/20073/7/20073/7/2007 1:47:59 PMPPASS
Scheduled by a contractor via Hello! on 3/7/2007 at 7:25:50 AM.
BLD06-00933 BLD-Other3/7/20073/7/20073/7/2007 1:34:19 PMPPASS
Kenny Sheering; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. exterior shear nailing ok.
BLD06-00794 BLD-Conference3/6/20073/7/20073/7/2007 11:33:22 AMAPASS
Phone #: ###-####
BLD06-00795 BLD-Conference3/6/20073/7/20073/7/2007 11:33:06 AMAPASS
Phone #: ###-####
BLD06-00811 BLD-Conference3/6/20073/7/20073/7/2007 11:32:50 AMAPASS
Phone #: ###-####
BLD06-00810 BLD-Conference3/6/20073/7/20073/7/2007 11:32:32 AMAPASS
Phone #: ###-####
BLD06-00809 BLD-Conference3/6/20073/7/20073/7/2007 11:27:36 AMAPASS
Phone #: ###-####
BLD06-00799 BLD-Conference3/6/20073/7/20073/7/2007 11:27:18 AMAPASS
Phone #: ###-####
BLD06-00800 BLD-Conference3/6/20073/7/20073/7/2007 11:27:02 AMAPASS
Phone #: ###-####
BLD06-00801 BLD-Conference3/6/20073/7/20073/7/2007 11:26:44 AMAPASS
Phone #: ###-####
BLD06-00802 BLD-Conference3/6/20073/7/20073/7/2007 11:26:27 AMAPASS
Phone #: ###-####
BLD06-00803 BLD-Conference3/6/20073/7/20073/7/2007 11:26:09 AMAPASS
Phone #: ###-####
BLD06-00805 BLD-Conference3/6/20073/7/20073/7/2007 11:25:51 AMAPASS
Phone #: ###-####
BLD06-00806 BLD-Conference3/6/20073/7/20073/7/2007 11:25:32 AMAPASS
Phone #: ###-####
BLD06-00808 BLD-Conference3/6/20073/7/20073/7/2007 11:25:14 AMAPASS
Phone #: ###-####
BLD07-00068 BLD-Foundation3/7/20073/7/20073/7/2007 10:24:05 AMAPASS
Scheduled by a contractor via Hello! on 3/7/2007 at 7:24:20 AM.
BLD07-00083 BLD-Foundation3/7/20073/7/20073/7/2007 10:23:38 AMAPASS
Scheduled by a contractor via Hello! on 3/7/2007 at 7:23:00 AM. Contact: ###-####.
BLD06-02384 BLD-Final3/6/20073/7/20073/7/2007 9:56:28 AMANR
Tim; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Needs life/safety final first.
BLD07-00419 BLD-Framing/Rough-in3/6/20073/7/20073/7/2007 9:53:03 AMAFAIL
Mike,
Can you please call me when you are headed to the job for the inspection so that I can meet you there
Thanks,

Todd Phone #: ###-####. Needs elec ri insp. Needs to removescrerws from wall to ceiling grid connection. not ok to cover. c/n posted.
BLD06-02534 BLD-Final3/7/20073/7/20073/7/2007 9:29:21 AMANR
Scheduled by a contractor via Hello! on 3/7/2007 at 7:30:15 AM. Contact: ###-####. Still needs other trades.
BLD06-00212 BLD-Final3/7/20073/7/20073/7/2007 9:28:40 AMANR
Scheduled by a contractor via Hello! on 3/7/2007 at 7:28:37 AM. Contact: ###-####. Still needs other trades.
BLD06-02605 BLD-Framing/Rough-in3/6/20073/7/20073/7/2007 9:16:11 AMAPASS
Kent; Phone #: ###-#### Internet Inspection Request from: Darla Downs. ok to place ceiling tile.