Inspections for the day of: Friday, March 7, 2008.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00625 INSP-Final Inspection3/7/20083/7/20083/7/2008 4:05:56 PMPPASS
Permit finaled
FIR07-00949 INSP-Sprinkler Rough-in/Hydro3/7/20083/7/20083/7/2008 4:05:23 PMPPASS
Sprinkler rough-in is passed. Will need a tenting inspection for the wet system prior to cover.
FIR08-00085 INSP-Sprinkler Rough-in3/7/20083/7/20083/7/2008 3:35:45 PMPPASS
The tenting inspection is passed. The sprinkler piping can be covered with the blow-in insulation.
BLD08-00260 FIRE-Final Inspection3/6/20083/7/20083/7/2008 2:35:06 PMPPASS
life safety passed.
FIR07-00972 INSP-Final Inspection3/6/20083/7/20083/7/2008 2:34:08 PMAFAIL
The west tenant work is passed. Stopped at the project twice but there is no access.
BLD08-00159 FIRE-Final Inspection3/6/20083/7/20083/7/2008 11:29:27 AMAPASS
Life safety passed.
BLD08-00396 FIRE-Final Inspection3/6/20083/7/20083/7/2008 11:28:46 AMAFAIL
Repair the emergency light in the west outdoor area. Provide verification that the south exit doors exit sign has battery backup. The nozzles for the hood suppression system need to be aligned with the appliances. The correct nozzles need to be supplied for the appliances. The appliances need to be positioned no closer than 6" to the inside edge of the hood. These are problems at both hoods.