ESC07-01312
| BMP Violation | 3/7/2008 | 3/7/2008 | 3/7/2008 4:47:44 PM | P | PART |
|
|
Cleaned up both alley way and front street. Put in drain inlet protection in the street and alley way. Wattle was installed at front of project and also protecting culvert at front of project. Need to pick up debris around lots. Was told that will be completed by Monday Morning. Will re-inspect on 3/10/08 CAS#460 ###-####
|
ESC07-01314
| BMP Violation | 3/7/2008 | 3/7/2008 | 3/7/2008 4:47:16 PM | P | PART |
|
|
Cleaned up both alley way and front street. Put in drain inlet protection in the street and alley way. Wattle was installed at front of project and also protecting culvert at front of project. Need to pick up debris around lots. Was told that will be completed by Monday Morning. Will re-inspect on 3/10/08 CAS#460 ###-####
|
ESC07-01315
| BMP Violation | 3/7/2008 | 3/7/2008 | 3/7/2008 4:46:57 PM | P | PART |
|
|
Cleaned up both alley way and front street. Put in drain inlet protection in the street and alley way. Wattle was installed at front of project and also protecting culvert at front of project. Need to pick up debris around lots. Was told that will be completed by Monday Morning. Will re-inspect on 3/10/08 CAS#460 ###-####
|
ESC07-01313
| BMP Violation | 3/5/2008 | 3/7/2008 | 3/7/2008 4:46:44 PM | A | PART |
|
|
Cleaned up both alley way and front street. Put in drain inlet protection in the street and alley way. Wattle was installed at front of project and also protecting culvert at front of project. Need to pick up debris around lots. Was told that will be completed by Monday Morning. Will re-inspect on 3/10/08 CAS#460 ###-####
|
ESC07-01313
| BMP Violation | 3/7/2008 | 3/7/2008 | 3/7/2008 4:31:59 PM | P | CANC |
|
|
|
ESC07-01312
| Site Preparation | 3/7/2008 | 3/7/2008 | 3/7/2008 3:38:22 PM | P | CANC |
|
|
|
MIS08-00036
| Grading Inspection | 3/7/2008 | 3/7/2008 | 3/7/2008 2:43:43 PM | P | PASS |
|
|
All trash debris has been removed. Drain inlets inside the parking lot have been protected. CAS#460 ###-####
|
ESC07-00661
| BMP Violation | 3/6/2008 | 3/7/2008 | 3/7/2008 1:08:39 PM | A | PART |
|
|
Site celaned up but silt fence needs to be trenched in. Overall site looks better. Discussed with RP over the other minor issues. CAS#460 ###-####
|
ESC07-00669
| BMP Violation | 3/6/2008 | 3/7/2008 | 3/7/2008 1:08:25 PM | A | PART |
|
|
Site celaned up but silt fence needs to be trenched in. Overall site looks better. Discussed with RP over the other minor issues. CAS#460 ###-####
|
ESC07-00668
| BMP Violation | 3/6/2008 | 3/7/2008 | 3/7/2008 1:08:07 PM | A | PART |
|
|
Site celaned up but silt fence needs to be trenched in. Overall site looks better. Discussed with RP over the other minor issues. CAS#460 ###-####
|
ESC07-00667
| BMP Violation | 3/6/2008 | 3/7/2008 | 3/7/2008 1:07:53 PM | A | PART |
|
|
Site celaned up but silt fence needs to be trenched in. Overall site looks better. Discussed with RP over the other minor issues. CAS#460 ###-####
|
ESC07-00666
| BMP Violation | 3/6/2008 | 3/7/2008 | 3/7/2008 1:07:36 PM | A | PART |
|
|
Site celaned up but silt fence needs to be trenched in. Overall site looks better. Discussed with RP over the other minor issues. CAS#460 ###-####
|
ESC07-01565
| Tracking Control | 3/4/2008 | 3/7/2008 | 3/7/2008 10:02:44 AM | A | CANC |
|
|
|
ESC07-01472
| Tracking Control | 3/4/2008 | 3/7/2008 | 3/7/2008 9:58:46 AM | P | PART |
|
|
Installed a pool where entrance would be so no entrance needed. They have a labor that comes and hand sweeps the parking lot after construction on a daily basis or when needed. CAS#460
|
ESC05-01082
| Site Final | 3/7/2008 | 3/7/2008 | 3/7/2008 8:57:09 AM | P | PASS |
|
|
Site stabilized PASS CAS#460
|
ESC07-00668
| Site Preparation | 3/6/2008 | 3/7/2008 | 3/6/2008 3:08:56 PM | A | CANC |
|
|
|