ESC11-00482
| Aging Inspection | 3/7/2012 | 3/7/2012 | 3/13/2012 2:18:32 PM | | CANC |
|
|
|
ESC11-00254
| General Inspection | 3/7/2012 | 3/7/2012 | 3/13/2012 2:17:41 PM | | CANC |
|
|
|
BLD10-01414
| BLD-Aging Inspection | 3/7/2012 | 3/7/2012 | 3/13/2012 2:15:31 PM | | CANC |
|
|
Re-sched.......
|
BLD12-00194
| BLD-Framing/Rough-in | 3/7/2012 | 3/7/2012 | 3/7/2012 9:35:12 PM | P | PART |
|
|
al - partial on the floor - early afternoon please Phone #: ###-#### Floor over concrete slab....OK
|
BLD11-01268
| BLD-Framing/Rough-in | 3/6/2012 | 3/7/2012 | 3/7/2012 9:33:11 PM | P | PASS |
|
|
Cover inspection for rooms: 118, 119, 120, 221, 222, 223, 224, 325, 326, 327, 426, 427, Electrical Room #1 (159), Mechanical Room #1 (162), Elevator Equipment Room #1. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
|
BLD12-00276
| BLD-Wall cover | 3/7/2012 | 3/7/2012 | 3/7/2012 9:31:46 PM | P | PASS |
|
|
Shear wall -- Kelly Phone #: ###-####
|
BLD11-02958
| BLD-Final | 3/6/2012 | 3/7/2012 | 3/7/2012 12:30:55 PM | A | PASS |
|
|
justin Phone #: ###-#### OK for Perm Occ.
|
ESC12-00039
| General Inspection | 3/6/2012 | 3/7/2012 | 3/7/2012 11:30:18 AM | A | FAIL |
|
|
Dan phone........Talked to RP about cleaning all hard surfaces ie....street, gutters, and sidewalks.
|
BLD10-02855
| BLD-Concrete | 3/6/2012 | 3/7/2012 | 3/7/2012 11:28:01 AM | A | DONE |
|
|
Should have been Conference insp. Correction Notice posted on front door. Provide a written response to Building Official, Jason Blais, on a proposed schedule/ time frame for aquiring a Certificate Of Occupancy.
|
BLD12-00187
| BLD-Final | 3/6/2012 | 3/7/2012 | 3/7/2012 11:19:23 AM | A | NR |
|
|
Doug Phone #: ###-#### Need fire finals
|