Inspections for the day of: Wednesday, March 7, 2012.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-00337 FIRE-Final Inspection3/7/20123/7/20123/7/2012 5:21:56 PMPNR
Project related fire alarm permit has not been issued at this time, currently in the "review" status.
BLD11-01142 FIRE-Conference3/7/20123/7/20123/7/2012 5:18:55 PMPDONE
Final inspection scheduled 3/8 PM.
FIR11-00496 INSP-Sprinkler Rough-in3/6/20123/7/20123/7/2012 5:17:56 PMAPART
See approved plan set for annotated locations including the 3rd floor north wing tenant and common corridor, 1st and 2nd floor north wing tenant showers, 1st and 2nd floor north wing common corridors, 2nd and 3rd floor south and north stairways.
FIR11-00448 INSP-Sprinkler Rough-in/Hydro3/6/20123/7/20123/7/2012 5:06:33 PMAPART
Inspection for cover at the new drop ceiling in the SW stair completed.
FIR11-00575 INSP-Alarm Testing3/6/20123/7/20123/7/2012 5:02:25 PMAPART
Today's inspection included under floor SD's at zones 4 and 5, clean link HSSD's at zones 1,2,3 and 4, HEPA shutdown at zones 1 thru 6 including program operations, duct detectors at mechanical mezzanine 43 and mech. room 44. Initiating device addresses and functionality tested okay. Noted one SD above the FATC in mech. room 44 to be relocated to the deck, MAU's at mech. mezzanine are not ready for shutdown test, discussed locations of duct detectors at the floor level east electrical room.
FIR11-00598 INSP-Final Inspection3/6/20123/7/20123/7/2012 4:42:04 PMANR
Check status Phone #: ###-#### >> Inspection requested via web by Jeff Walton
FIR12-00037 INSP-Final Inspection3/7/20123/7/20123/7/2012 4:41:16 PMAPASS
Inspection passed. Fire alarm permit finaled.