BLD08-00870
| FIRE-Conference | 3/7/2012 | 3/7/2012 | 3/7/2012 3:41:58 PM | P | DONE |
|
|
I spoke to Mark ###-####, at Allied General, about getting a fire permit for the work that has been performed. He stated that he would follow up on the work and get a permit .
|
BLD11-02869
| FIRE-Final Inspection | 3/6/2012 | 3/7/2012 | 3/7/2012 3:37:39 PM | P | PASS |
|
|
Life safety passed.
|
FIR12-00023
| INSP-Alarm Testing | 3/6/2012 | 3/7/2012 | 3/7/2012 2:42:09 PM | P | DONE |
|
|
See the city approved plans for locations where a strobe needs to be added at the north end of an exit corridor, candella needs to be increased in a room. New horns are shown to be added around the Service building but have not been installed. The horns need to be installed or be approved by Boise City plan review to remain deleted. Additional strobes have been added in a restroom and others have been relocated to nearby walls. These and all other changes need to be shown on as-built plans. Per Brian, the simplex tech., the same EOL issues as the last project are present. I deferred him to Deputy Chief Gervais. No testing of the audio/visual circuits was performed.
|
FIR11-00691
| INSP-Final Inspection | 3/7/2012 | 3/7/2012 | 3/7/2012 2:31:15 PM | P | PASS |
|
|
permit finaled
|
BLD11-03003
| FIRE-Conference | 3/6/2012 | 3/7/2012 | 3/7/2012 11:19:23 AM | A | DONE |
|
|
I went over life safety requirements with general contractor. There is an issue with solid shelving on the large storage racks. Also per Tim Frost racking was not addressed with the sprinkler plans but what I described to him over the phone he was ok with as long as the storage did not exceed 12' in height.
|
BLD11-02989
| FIRE-Final Inspection | 3/6/2012 | 3/7/2012 | 3/7/2012 8:22:39 AM | A | PASS |
|
|
life safety passed
|
BLD11-02988
| FIRE-Final Inspection | 3/6/2012 | 3/7/2012 | 3/7/2012 8:00:01 AM | A | PASS |
|
|
life safety passed
|