BLD12-02334
| BLD-Framing/Rough-in | 3/7/2013 | 3/7/2013 | 3/8/2013 7:36:32 AM | P | NR |
|
|
nick Phone #: ###-#### Walk thru.....with contractor.
|
BLD13-00381
| BLD-Conference | 3/6/2013 | 3/7/2013 | 3/8/2013 7:33:06 AM | P | PEND |
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Howell RE-sched.....
|
ESC12-00774
| Site Final | 3/7/2013 | 3/7/2013 | 3/7/2013 5:53:45 PM | P | FAIL |
|
|
Michah phone Need to complete landscaping.
|
ESC13-00100
| Site Preparation | 3/7/2013 | 3/7/2013 | 3/7/2013 5:52:01 PM | P | PASS |
|
|
Nik phone......
|
BLD12-02027
| BLD-Final | 3/7/2013 | 3/7/2013 | 3/7/2013 5:51:06 PM | P | NR |
|
|
micah Phone #: ###-####
|
ESC12-00144
| Site Final | 3/7/2013 | 3/7/2013 | 3/7/2013 3:40:09 PM | P | FAIL |
|
|
Susan phone Need to complete landscaping.
|
BLD12-00343
| BLD-Final | 3/7/2013 | 3/7/2013 | 3/7/2013 1:11:13 PM | P | PART |
|
|
chris Phone #: ###-#### OK For Temp occ. OK for Perm Occ when all Fire Finals are complete. Need to complete stalls in center restroom
|
GCB12-00104
| GCB-Final | 3/6/2013 | 3/7/2013 | 3/7/2013 12:57:16 PM | A | FAIL |
|
|
Goldy @ ###-#### Call in advance Handrail return, Verification from Leon on exactly what is required for off street parking, sidewalk, walkway. Need Electr and Plumbing finals.
|
BLD13-00254
| BLD-Foundation | 3/5/2013 | 3/7/2013 | 3/7/2013 12:17:41 PM | A | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD12-03292
| BLD-Energy code compliance | 3/7/2013 | 3/7/2013 | 3/7/2013 10:55:48 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
|
ESC13-00113
| Site Preparation | 3/6/2013 | 3/7/2013 | 3/7/2013 9:46:05 AM | A | PART |
|
|
All BMPs in place except barrier at sidewalk. Tried to contact RP. Mail box is full and could not leave mssg. Concret contr. to wash out in side garage area.
|