BLD15-02315
| BLD-Other | 3/7/2016 | 3/7/2016 | 3/7/2016 12:00:00 AM | P | DONE |
|
|
Tony and I reviewed the project to determine current status. Structure has not been secured to new foundation walls and misc. concrete work has yet to be completed at front porch. Stuctural steel has been inspected by special inspection. No electrical has been connected and only sewer from street has been installed. The structure is secured against entry.
|