PLM15-03753
| Water and/or Sewer | 3/7/2016 | 3/7/2016 | 3/7/2016 4:08:26 PM | P | PASS |
|
|
Troy Phone #: ###-#### final ok
|
PLM15-03753
| Final | 3/7/2016 | 3/7/2016 | 3/7/2016 4:07:48 PM | P | PASS |
|
|
|
PLM16-00788
| Final | 3/7/2016 | 3/7/2016 | 3/7/2016 4:06:00 PM | P | PART |
|
|
Call ahead // Randy Phone #: ###-#### needs dcva tested
|
PLM16-00736
| Plumbing Rough-in | 3/7/2016 | 3/7/2016 | 3/7/2016 4:04:48 PM | P | PASS |
|
|
Bathroom addition under test. Toilet, wall mount shower, freestanding tub with wall filler and lavatory. Addition plumbing. Hasib is contact. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
PLM16-00729
| Water and/or Sewer | 3/7/2016 | 3/7/2016 | 3/7/2016 3:22:19 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Charles Parks needs dcva tested
|
MEC15-04069
| Final | 3/7/2016 | 3/7/2016 | 3/7/2016 3:21:40 PM | P | PART |
|
|
needs to lable the hydronic system per appendix L of the plumbing code
|
MEC15-05313
| Final | 3/7/2016 | 3/7/2016 | 3/7/2016 2:04:34 PM | P | NR |
|
|
Bj 5730755 Inspection requested via web by william kerwin no air balance report
|
PLM15-03677
| Final | 3/7/2016 | 3/7/2016 | 3/7/2016 2:04:08 PM | P | PASS |
|
|
Vent for boiler under 5#test, back flow tested and fixtures all caulkrd. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
PLM16-00672
| Plumbing Rough-in | 3/6/2016 | 3/7/2016 | 3/7/2016 11:33:13 AM | A | FAIL |
|
|
After talking with Bill, Water lines in garage wall and ceiling ok due to fact other side is heated space. I adjusted some to maximize insulation. We will be using heat tape under stairwell for exposed piping. I repiped drain piping to meet code for horizontal wet venting. Phone #: ###-#### Inspection requested via web by Todd Walter 1) waste test ok 2) raise water in garage ceiling above the insulation. 3) move water lines in garage wall to inside the insulation 4) call me to go over this when you and the builder can meet me on the job.
|
PLM15-04177
| Groundwork | 3/4/2016 | 3/7/2016 | 3/7/2016 9:48:57 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy this is just the test on the drain to the trench drain, will vent when they set the trench drain. Robert is going to verify the piping requirements with the approved plans today.
|