ELE16-00644
| Permanent Service | 3/7/2016 | 3/7/2016 | 3/7/2016 3:18:45 PM | P | PASS |
|
|
Please give me a call we are changing the service today and will need an inspection for re-energize this afternoon Phone #: ###-#### Inspection requested via web by Brad Baker p/s o/h rec ok look for water bond if needed
|
ELE15-00495
| Electrical Rough-In | 3/7/2016 | 3/7/2016 | 3/7/2016 2:46:21 PM | P | PASS |
|
|
Wall cover inspection Phone #: ###-#### Inspection requested via web by Toby Groves r/i ok G line wall from col. 4 to col. 2, 2 Line wall from col. K to col. G
|
ELE16-00679
| Electrical Rough-In | 3/6/2016 | 3/7/2016 | 3/7/2016 2:02:57 PM | P | PASS |
|
|
wiring, switches, receptacles and fixtures installed and ready for initial inspection. Request inspection anytime during the afternoon of 7 March. Phone #: ###-#### Inspection requested via web by Del Renken r/i ok for u.ground to shed, grounding electrode, sub panel and r/i of unit ok
|
ELE16-00628
| Final | 3/7/2016 | 3/7/2016 | 3/7/2016 1:25:04 PM | P | PASS |
|
|
Trim (2) receptacles, (1) light switch Phone #: ###-#### Inspection requested via web by Lars Johnson final ok
|
ELE15-04130
| Final | 3/7/2016 | 3/7/2016 | 3/7/2016 12:55:27 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt corrections made final ok
|
ELE16-00716
| Temporary Service | 3/7/2016 | 3/7/2016 | 3/7/2016 11:47:31 AM | P | PASS |
|
|
Call for gate code, thanks Phone #: ###-#### Inspection requested via web by Robert Schroder t/s u/g n ok
|
ELE16-00689
| Electrical Rough-In | 3/4/2016 | 3/7/2016 | 3/7/2016 11:17:42 AM | A | PASS |
|
|
Rough in bath remodel Phone #: ###-#### Inspection requested via web by Barbara Szurgot r/i bathroom ok
|
ELE16-00524
| Final | 3/7/2016 | 3/7/2016 | 3/7/2016 11:00:02 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bryan McLaughlin final ok
|
ELE16-00480
| Electrical Rough-In | 3/7/2016 | 3/7/2016 | 3/7/2016 10:59:34 AM | A | PASS |
|
|
ceiling cover Phone #: ###-#### Inspection requested via web by Bryan McLaughlin r/i tgrid ceilings ok (support whips longer than 6 foot within 12" of j box )
|
ELE16-00596
| Electrical Rough-In | 3/4/2016 | 3/7/2016 | 3/7/2016 10:14:44 AM | A | PASS |
|
|
Equipotential grid inspection. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE r/i eq. plane ok no pool cover light podded
|
ELE16-00698
| Temporary Service | 3/4/2016 | 3/7/2016 | 3/7/2016 9:58:23 AM | A | PASS |
|
|
Dan Cromie is contact at ###-####. thank you Phone #: ###-#### Inspection requested via web by Debby Pierce t/s o/h n ok construction trailer not hooked up yet
|
ELE16-00406
| Final | 3/4/2016 | 3/7/2016 | 3/7/2016 8:27:47 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk corrections made final ok
|
ELE16-00709
| Permanent Service | 3/5/2016 | 3/7/2016 | 3/7/2016 8:09:55 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brandon Blackham p/s o/h rec ok
|
ELE12-01307
| ELE-Aging Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 7:39:40 AM | | DONE |
|
|
too busy
|
ELE11-02621
| ELE-Aging Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 7:39:15 AM | | DONE |
|
|
too busy
|
ELE12-00137
| ELE-Aging Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 7:38:49 AM | | DONE |
|
|
no time to busy
|