BLD17-00212
| BLD-Aging Inspection | 3/7/2018 | 3/7/2018 | 3/8/2018 2:37:29 PM | | DONE |
|
|
|
BLD17-00031
| BLD-Conference | 3/6/2018 | 3/7/2018 | 3/7/2018 4:49:45 PM | P | PEND |
|
|
Inform permit holder to schedule required finals.,, called Jon,, left a message
|
MIS17-00369
| BLD-Conference | 2/24/2018 | 3/7/2018 | 3/7/2018 4:44:33 PM | A | NH |
|
|
Issue 5 day N&O to obtain permits and approval for an ADU if property appears to be occupied as such.//status
|
BLD16-04167
| BLD-Final | 3/7/2018 | 3/7/2018 | 3/7/2018 4:42:02 PM | P | DONE |
|
|
Late afternoon please. Please call at least 45 minutes in advance to ensure someone is there to meet you/ let you in. Thanks! Phone #: ###-#### Inspection requested via web by Annie Coates,, home owner said he is good with everything,, he will finish the basement at a later time
|
BLD16-04167
| DOC - Permit Finaled | 3/7/2018 | 3/7/2018 | 3/7/2018 4:40:20 PM | P | PASS |
|
|
|
BLD18-00347
| BLD-Framing/Rough-in | 3/7/2018 | 3/7/2018 | 3/7/2018 4:37:17 PM | P | NR |
|
|
Angela (Melane''s friend) partial frame-if locked please call for access Phone #: ###-####
|
BLD17-03066
| BLD-Final | 3/7/2018 | 3/7/2018 | 3/7/2018 3:19:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Josh Woodbeck,, they got a fix from the engineer to through bolt the connections per Josh,, ok
|
BLD17-03066
| DOC - Permit Finaled | 3/7/2018 | 3/7/2018 | 3/7/2018 3:18:54 PM | P | PASS |
|
|
done
|
BLD16-02566
| BLD-Wall cover | 3/5/2018 | 3/7/2018 | 3/7/2018 3:04:36 PM | P | PASS |
|
|
Vince Phone #: ###-####,, ok to insulate
|
BLD17-01609
| BLD-Foundation | 3/7/2018 | 3/7/2018 | 3/7/2018 2:06:51 PM | P | PART |
|
|
Annie Phone #: ###-####,, work in progress on the retaining walls,, paper plans not on site
|
BLD17-03005
| BLD-Footing | 3/7/2018 | 3/7/2018 | 3/7/2018 1:42:47 PM | P | PASS |
|
|
John Phone #: ###-####
|
BLD16-04550
| BLD-Conference | 3/6/2018 | 3/7/2018 | 3/7/2018 12:48:03 PM | A | PART |
|
|
handrail conf // Ron Phone #: ###-####
|
BLD18-00699
| BLD-Final | 3/5/2018 | 3/7/2018 | 3/7/2018 11:37:17 AM | A | PASS |
|
|
Ron Phone #: ###-####,, done per plan
|
BLD17-04493
| BLD-Foundation | 3/6/2018 | 3/7/2018 | 3/7/2018 11:36:35 AM | A | PASS |
|
|
Rebar // Ed Phone #: ###-####
|
BLD18-00261
| BLD-Foundation | 3/6/2018 | 3/7/2018 | 3/7/2018 10:14:21 AM | A | PART |
|
|
work in progress,, ok
|
BLD18-00260
| BLD-Foundation | 3/6/2018 | 3/7/2018 | 3/7/2018 10:14:00 AM | A | PART |
|
|
|
MIS17-00405
| DOC - Permit Finaled | 3/7/2018 | 3/7/2018 | 3/7/2018 8:18:14 AM | P | PASS |
|
|
|