Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-00212 BLD-Aging Inspection3/7/20183/7/20183/8/2018 2:37:29 PM DONE
BLD17-00031 BLD-Conference3/6/20183/7/20183/7/2018 4:49:45 PMPPEND
Inform permit holder to schedule required finals.,, called Jon,, left a message
MIS17-00369 BLD-Conference2/24/20183/7/20183/7/2018 4:44:33 PMANH
Issue 5 day N&O to obtain permits and approval for an ADU if property appears to be occupied as such.//status
BLD16-04167 BLD-Final3/7/20183/7/20183/7/2018 4:42:02 PMPDONE
Late afternoon please. Please call at least 45 minutes in advance to ensure someone is there to meet you/ let you in. Thanks!
Phone #: ###-#### Inspection requested via web by Annie Coates,, home owner said he is good with everything,, he will finish the basement at a later time
BLD16-04167 DOC - Permit Finaled3/7/20183/7/20183/7/2018 4:40:20 PMPPASS
BLD18-00347 BLD-Framing/Rough-in3/7/20183/7/20183/7/2018 4:37:17 PMPNR
Angela (Melane''s friend) partial frame-if locked please call for access Phone #: ###-####
BLD17-03066 BLD-Final3/7/20183/7/20183/7/2018 3:19:14 PMPPASS
Phone #: ###-#### Inspection requested via web by Josh Woodbeck,, they got a fix from the engineer to through bolt the connections per Josh,, ok
BLD17-03066 DOC - Permit Finaled3/7/20183/7/20183/7/2018 3:18:54 PMPPASS
done
BLD16-02566 BLD-Wall cover3/5/20183/7/20183/7/2018 3:04:36 PMPPASS
Vince Phone #: ###-####,, ok to insulate
BLD17-01609 BLD-Foundation3/7/20183/7/20183/7/2018 2:06:51 PMPPART
Annie Phone #: ###-####,, work in progress on the retaining walls,, paper plans not on site
BLD17-03005 BLD-Footing3/7/20183/7/20183/7/2018 1:42:47 PMPPASS
John Phone #: ###-####
BLD16-04550 BLD-Conference3/6/20183/7/20183/7/2018 12:48:03 PMAPART
handrail conf // Ron Phone #: ###-####
BLD18-00699 BLD-Final3/5/20183/7/20183/7/2018 11:37:17 AMAPASS
Ron Phone #: ###-####,, done per plan
BLD17-04493 BLD-Foundation3/6/20183/7/20183/7/2018 11:36:35 AMAPASS
Rebar // Ed Phone #: ###-####
BLD18-00261 BLD-Foundation3/6/20183/7/20183/7/2018 10:14:21 AMAPART
work in progress,, ok
BLD18-00260 BLD-Foundation3/6/20183/7/20183/7/2018 10:14:00 AMAPART
MIS17-00405 DOC - Permit Finaled3/7/20183/7/20183/7/2018 8:18:14 AMPPASS