ESC16-00625
| General Inspection | 3/7/2018 | 3/7/2018 | 3/8/2018 12:33:09 PM | | PASS |
|
|
Framing complete. No erosion issues.
|
ESC17-00331
| Aging Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 2:44:18 PM | | PASS |
|
|
Installing fence in back. Yard is landscaped.
|
ESC15-01210
| General Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 2:39:06 PM | | PART |
|
|
DI bags are nearly full and need to be removed. Dirt needs to be cleaned from gutter around DIs.
|
ESC16-00406
| General Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 1:56:58 PM | | PASS |
|
|
Lots are in good shape and hillside BMPs held up over the winter. DI bag on Broadstone needs to be cleaned.
|
ESC13-00193
| General Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 12:28:58 PM | | PASS |
|
|
WIP. Lot clean.
|
ESC14-01063
| General Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 12:04:44 PM | | PART |
|
|
Trackout from new home construction. Some trackout around concrete washout.
|
ESC15-00857
| General Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 11:41:56 AM | | PASS |
|
|
Lots are all stable. Some tracking around top of construction access road and road leading to washout, washout is blocked by an excavator. Lot currently building has lots of wood waste laying around.
|
ESC17-01387
| General Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 11:06:27 AM | P | PASS |
|
|
Very minimal disturbance, no issues. Home almost complete.
|
ESC16-01651
| General Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 10:54:27 AM | P | PART |
|
|
Lots of trackout on roads and sidewalks. Homesites are clean of building waste. Concrete washout has been relocated.
|
ESC17-01767
| Random Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 10:39:32 AM | P | PASS |
|
|
Permit posted. No issues at site.
|
ESC17-00223
| DOC - Permit Finaled | 3/7/2018 | 3/7/2018 | 3/7/2018 10:32:53 AM | P | PASS |
|
|
|
ESC17-00044
| DOC - Permit Finaled | 3/7/2018 | 3/7/2018 | 3/7/2018 10:32:39 AM | P | PASS |
|
|
|
ESC16-01243
| DOC - Permit Finaled | 3/7/2018 | 3/7/2018 | 3/7/2018 10:32:32 AM | P | PASS |
|
|
|