Inspections for the day of: Monday, March 8, 1999.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD98-02579 INSP - Final3/8/19993/8/19993/8/1999 12:00:00 AM PASS
03/08/99 340 - card to cont
BLD98-03026 INSP - Final3/8/19993/8/19993/8/1999 12:00:00 AM PART
03/08/99 340 - need htg. struct ok
BLD98-03796 INSP - Framing/Rough-in3/8/19993/8/19993/8/1999 12:00:00 AM PART
03/08/99 340 - rec'd eng's drawing. ok to continue; add wires as req'd
BLD98-00131 INSP - Final3/5/19993/8/19993/8/1999 12:00:00 AMAPASS
03/08/99 340 - OK TO SIGN CARD IN OFFICE, AS NOT AT SITE
BLD99-00160 INSP - Final3/5/19993/8/19993/8/1999 12:00:00 AMACANC
###-#### call before going Bob...canc, sent in pm for a.m., unable to make, will recall
BLD98-03243 INSP - Framing/Rough-in3/5/19993/8/19993/8/1999 12:00:00 AMAPART
03/08/99 340 - pend spec insp, roof deck
BLD99-00301 INSP - Framing/Rough-in3/5/19993/8/19993/8/1999 12:00:00 AMANR
03/08/99 340 - NEED DETAIL FOR OCC. SEP. AT EXIST SOFFIT AREA,ELEC INSP,
BLD99-00253 INSP - Foundation3/8/19993/8/19993/8/1999 12:00:00 AMPPART
03/08/99 340 - isolated ftg per eng'g at front of bldg...ok to epoxy 3/4
BLD96-02023 INSP - Final2/11/19993/8/19993/8/1999 12:00:00 AMPFAIL
03/08/99 340 - need 4" spacing at guardrail, other sig's, keep cn
BLD98-02579 INSP - Final3/5/19993/8/19993/8/1999 12:00:00 AMPPASS
03/08/99 340 - CARD TO CONT
BLD98-03796 INSP - Framing/Rough-in3/5/19993/8/19993/8/1999 12:00:00 AMPPART
03/08/99 340 - rec'd eng'g. ok to continue
BLD98-03026 INSP - Final3/5/19993/8/19993/8/1999 12:00:00 AMPPART
03/08/99 340 - struct ok, need htg
BLD98-03112 INSP - Concrete3/8/19993/8/19993/8/1999 12:00:00 AMPPART
LATE AFTERNOON GEORGE ###-####...part, masonry at west wall, not complete.