Inspections for the day of: Wednesday, March 8, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00380 BLD-Foundation3/6/20003/8/20003/8/2000 12:00:00 AMAPASS
###-####
BLD00-00231 BLD-Framing/Rough-in3/7/20003/8/20003/8/2000 12:00:00 AMAPASS
###-####
BLD99-03132 BLD-Final3/7/20003/8/20003/8/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/07/2000 at 18:10:24. Contact: ###-####. C/C #17339 3/8/00 2:07:13 PM
BLD99-03620 BLD-Energy code compliance3/8/20003/8/20003/8/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/08/2000 at 08:07:47. Contact: ###-####.
BLD00-00490 BLD-Footing3/8/20003/8/20003/8/2000 12:00:00 AMPPART
###-#### Footing appears ok. 3/9/00 9:15:30 AM
BLD00-00430 BLD-Concrete3/8/20003/8/20003/8/2000 12:00:00 AMPPART
POOL REBAR\\###-#### DAN Install rebar to have continuous bond beam @ skimmer. 3/9/00 9:15:21 AM
BLD99-03351 BLD-Framing/Rough-in3/7/20003/8/20003/8/2000 12:00:00 AMPFAIL
###-#### C/N compelte corr. 3/9/00 9:15:38 AM
BLD97-01188 BLD-Final3/7/20003/8/20003/8/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/07/2000 at 16:56:30. Contact: ###-####. C/N..smoke det. perim. insulation verify plumb, elect. finals. 3/9/00 9:15:03 AM
BLD00-00044 BLD-Energy code compliance3/7/20003/8/20003/8/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/07/2000 at 07:55:17. Contact: ###-####.