BLD00-00497
| BLD-Foundation | 3/7/2000 | 3/8/2000 | 3/8/2000 12:00:00 AM | A | PASS |
|
|
###-#### Foundation complete. 3/9/00 2:12:24 PM
|
BLD00-00178
| BLD-Foundation | 3/7/2000 | 3/8/2000 | 3/8/2000 12:00:00 AM | A | PASS |
|
|
radar ###-#### found wall Ok subject. 3/9/00 2:12:32 PM
|
BLD00-00347
| BLD-Footing | 3/7/2000 | 3/8/2000 | 3/8/2000 12:00:00 AM | A | PASS |
|
|
phil ###-####
|
MEC00-00707
| Final | 3/7/2000 | 3/8/2000 | 3/8/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
MIS00-00038
| BLD-Conference | 3/8/2000 | 3/8/2000 | 3/8/2000 12:00:00 AM | P | CANC |
|
|
call 1st before insp---jim ritter cell ###-#### propietary insp Wrong place 3/9/00 2:12:43 PM
|
BLD00-00090
| BLD-Final | 3/8/2000 | 3/8/2000 | 3/8/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC99-01153
| Final | 3/8/2000 | 3/8/2000 | 3/8/2000 12:00:00 AM | P | FAIL |
|
|
###-#### John or Marie ###-#### 1" clearance to b-vent. 3/9/00 2:13:53 PM
|
BLD00-00028
| BLD-Footing | 3/8/2000 | 3/8/2000 | 3/8/2000 12:00:00 AM | P | PART |
|
|
###-#### Needs soils letter of compliance from engineer, also enlarged footings are not inplace at locations shown on plans, contractor said he will dig these out. 3/9/00 2:13:30 PM
|