BLD00-01837
| BLD-Final | 3/5/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 13:08:25. Contact: ###-####. c/n , plans, framing issues, cantilevered porch... 3/8/2001 11:58:25 AM
|
MIS01-00027
| BLD-Final | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | FAIL |
|
|
fn occ-- ken ###-####; need plbg final; add handrails, guards, ok for t/o 3/8/2001 11:35:24 AM
|
BLD00-00407
| BLD-Footing | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 14:23:44. Contact: ###-####...called in error 3/8/2001 10:13:44 AM
|
BLD00-02971
| BLD-Framing/Rough-in | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PART |
|
|
###-#### main floor area ok to cover; maintain 1hr demising wall, firestop penetrations 3/8/2001 12:17:23 PM
|
BLD00-00514
| BLD-Wall cover | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 14:54:40. Contact: ###-####. ok to cover hvac shaft walls...per detail. 3/8/2001 4:32:34 PM
|
BLD99-02394
| BLD-Conference | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 3/8/2001 9:20:23 AM w/ arch re c/n...need 1hr ext wall per plans at east side; prop. line assumed to be at 10'7"...no protected openings
|
BLD00-03639
| BLD-Conference | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 3/8/2001 9:21:20 AM need 1hr ext wall at east; complete gyp at 1hr stairs
|
BLD01-00407
| BLD-Foundation | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PART |
|
|
###-#### poured;prev. insp by 316 3/8/2001 3:20:21 PM 3/8/2001 4:29:02 PM
|
BLD00-00880
| BLD-Final | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PASS |
|
|
fn insp door will be open--kay- ###-####
|
BLD99-03382
| BLD-Conference | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/8/2001 3:09:58 PM w/ John Menard re plan resub.
|
BLD99-03382
| BLD-Conference | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/8/2001 3:09:58 PM w/ John Menard re plan resub.
|
BLD00-03611
| BLD-Framing/Rough-in | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 3/8/2001 4:34:09 PM restroom lids ok, wood removed, gyp added as req'd...int walls ok, may need dampers at hvac at demising
|
MEC00-01698
| Final | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/8/2001 5:05:25 PM c/n ok
|
BLD00-01649
| BLD-Conference | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/8/2001 5:10:08 PM w/ J. Menard and Carl W on resub...need further info for top of shaft
|