MIS01-00027
| FIR-Final | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PASS |
|
|
bld fn also set up ###-####
|
FIR01-00095
| INSP-Final Inspection | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-01867
| FIRE-Final Inspection | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 15:55:57. Contact: ###-####.
|
BLD99-01895
| FIRE-Final Inspection | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 409 On 3/7/2001 4:05:29 PM
|
BLD98-01180
| FIRE-Final Inspection | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 409 On 3/8/2001 9:08:17 AM
|
FIR01-00096
| INSP-Sprinkler Rough-in | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 409 On 3/8/2001 10:58:14 AM underground only okay to cover; hydrant too close to building at southeast corner per Pat the hydrant is to be relocated; FDC will be moved to front of building
|
BLD00-03070
| FIRE-Final Inspection | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PASS |
|
|
Rocky ###-####
|
BLD00-00514
| FIRE-Conference | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 14:55:27. Contact: ###-####. requirements for ashell and core compliance 3/8/2001 2:37:44 PM
|
BLD00-02503
| FIRE-Final Inspection | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | FAIL |
|
|
Harry ###-####
|